
Native TCT User Guide-v1.0
Figure 3-5: Creating a new plan in TCT-Manager
Figure 3-6: Input plan name in TCT-Manager
3.1.1.4
Perform Health check:
As shown in Figure 3-7, health check routines will be invoked to check the status of the target
before executing the selected test suites. After all health check routines pass, TCT-Manager
runs selected test suites.