6. Service and maintenance
Gloves should comply with: 2019-4121X.
All service and maintenance must be performed without danger.
System must be shut off and cooled down before service is performed.
Access to bulb change or quartz glass change can be done by detaching lamps from fittings / clips.
6.1 Bulb change:
1. Switch off and let the system cool down for at least 30 minutes.
2. Hold on to the quartz glass with clean gloves.
3. Carefully pull the quartz glass free of the clips.
4. Loosen the screw connection around the cable.
5. Carefully pull back on cord until the bulb comes free of flange.
6. Carefully tilt the plug free of the bulb. NOTE Hold on to the bulb!
7. Carefully pull the bulb out of the quartz glass.
8. Switch to a new bulb and insert it into the quartz glass.
9. Attach the plug to the new bulb and refit the screw connection.
6.2. Change of quartz glass:
1.
Switch off and let the system cool down for at least 30 minutes.
2. Remove bulb as specified in section 6.1.
3. Hold on to quartz glass and flange.
4. Carefully pull the quartz glass straight ahead.
5. Carefully pull on quartz glass until it releases the flange –
CAUTION Beware of glass splinters.
6. Attach new quartz glass to flanges and re-insert bulb.
7. Attach plug to bulb and close with screw connection.
8. Place the quartz glass in the same position and reassemble.