background image

24

W415-0381 / H / 12.07.07

FIGURE 57

Closing the air shutter will cause a more yellow fl ame, but can lead 
to carboning. Opening the air shutter will cause a more blue fl ame, 
but can cause fl ame lifting from the burner ports. The fl ame may not 
appear yellow immediately; allow 15 to 30 minutes for the fi nal fl ame 
colour to be established. 

Air shutter adjustment must only be done by a qualified 

installer!

To access the air shutter, remove the two screws that secure the cover 
to the air housing, taking care not to damage the gasket.

Adjust the pilot screw to provide properly sized fl ame. Turn in a 
clockwise direction to reduce the gas fl ow.

 

Air shutters have been factory set open according to the chart 
below:

These settings are for the maximum horizontal vent run.- Adjust-
ment may be required depending on fuel type, vent confi guration 
and altitude.

FIGURE 55

 AIR 

SHUTTER 

NG   1/4" 

 

LP  7/16"  

FIGURE 54

VENTURI COVER

FIGURE 58

ADJUSTMENTS

PILOT BURNER ADJUSTMENT

VENTURI ADJUSTMENT

NOTE:

 Ensure burner is seated onto orifi ce.

FLAME CHARACTERISTICS

It is important to periodically perform a visual check of the pilot 
and the burner fl ames. Conpare them to the fi gures shown. If any 
fl ames appear abnormal call a qualifi ed service technician.

FIGURE 56

Содержание BGD42

Страница 1: ...1 W415 0381 H 12 07 07 W415 0381 H 12 07 07 10 00...

Страница 2: ...nts toddlers from touching hot surfaces Even after the fireplace is out the glass and or screen will remain hot for an extended period of time Check with your local hearth specialty dealer for safety...

Страница 3: ...venting components used in the installation of the replace NAPOLEON warrants its stainless steel burners against defects in workmanship and material for life subject to the following conditions During...

Страница 4: ...rity having jurisdiction the certi ed high altitude input rating shall be reduced at the rate of 4 for each additional 1 000ft Maximum output for natural gas is 19 500 BTU hr at an ef ciency of 68 5 w...

Страница 5: ...5 W415 0381 H 12 07 07 FIGURE 1 INSTALLATION OVERVIEW FIGURE 2...

Страница 6: ...Direct Temp and American Metal Amerivent follow the installation procedure provided with the venting components All outer pipe joints of these venting systems must be sealed using Red RTV Hight Temper...

Страница 7: ...AIR TERMINAL LOCATION CLEARANCES 32 32 32 32 32 32 4 Using a soffit heat shield W585 0096 or equivalent the distance may be reduced to a minimum of 18 It is recommended to maximize the distance to th...

Страница 8: ...at when nal grading is completed the bottom air slot is located a minimum of 12 above grade FIGURES 4 a b FIGURE 5 TYPICAL VENT INSTALLATIONS NOTE When terminating vertically the restrictor plate W500...

Страница 9: ...tal run horizontal run verti cal rise to maximum of 40 feet vertical rise is less than horizontal run horizontal run verti cal rise to maximum of 24 75 feet 4 2timesthe vertical rise equal to or great...

Страница 10: ...of offset 135 in feet VT combined vertical vent lengths in feet feet inches 1 0 03 0 5 15 0 45 6 0 30 0 9 11 0 45 1 35 16 0 90 2 7 32 0 the rst 45 and 90 offset has a zero value and is shown in the f...

Страница 11: ...T when HT VT Simple venting con guration only one 45 and 90 elbow Example 2 V1 4 ft V2 1 5 ft VT V1 V2 4 ft 1 5 ft 5 5 ft H1 2 ft H2 1 ft H3 1 ft H4 1 5 ft HR H1 H2 H3 H4 2 1 1 1 5 5 5 ft HO 03 one 45...

Страница 12: ...et 25 9 40 Since both formulas are met this vent con guration is acceptable when HT VT Simple venting con gurations FIGURE 10 REQUIRED VERTICAL RISE IN FEET VT HORIZONTAL VENT RUN PLUS OFFSETS IN FEET...

Страница 13: ...40 Since both formulas are met this vent con guration is acceptable REQUIRED VERTICAL R I S E I N FEET VT HORIZONTAL VENT RUN PLUS OFFSET IN FEET HT FIGURE 12 The shaded area within the lines represe...

Страница 14: ...learance of 2 all around the vent pipe on all horizontal runs to combustibles is required Use restop spacer W010 1778 supplied VERTICAL VENT SECTIONS A minimum of 1 all around the vent pipe on all ver...

Страница 15: ...combus tion air collar and secure with 3 8 screws 6 If more liner needs to be used to reach the replace couple them together as illustrated The vent system must be supported approximately every 3 feet...

Страница 16: ...erminal sleeves engage into the vent pipes and sealant Secure the terminal to the exterior wall and make weather tight by sealing with caulking not supplied Theairterminalmountingplatemaybe recessed i...

Страница 17: ...h a 5 collapsed telescopic pipe to the last section of rigid piping Secure with screws and seal Repeat using a 8 telescopic pipe 10 Run a bead of high temperature sealant W573 0007 not sup plied Mill...

Страница 18: ...is positioned and the vent system is installed Use 2x4 s and frame to local building codes FIGURES 33 It is not necessary to install a hearth extension with this replace system When roughing in the r...

Страница 19: ...Centre the nailing tab vertically on the corner post Figure 36 a Drill through the centre of the top and bottom slots in the nailing tab Secure using the two sheet metal screws supplied This allows t...

Страница 20: ...clips into the slots located at the bottom left and right corners of the unit To remove the louvres pull the back tabs of the clips forward while push ing the louvre assembly back Lift the clip B HING...

Страница 21: ...g embers for a maximum glowing effect Log colours may vary During the initial use of the replace the colours will become more uniform as colour pigments burn in during the heat activated curing proces...

Страница 22: ...ll automatically start approxi mately 10 minutes after lighting the fireplace and will run for ap proximately 30 45 minutes after the fireplace has been turned off Use of the fan increases the output...

Страница 23: ...valve has an interlock device which will not al low the pilot burner to be lit until the thermocouple has cooled Allow approximately 60 seconds for the thermocouple to cool When lighting and re lighti...

Страница 24: ...e gasket Adjust the pilot screw to provide properly sized ame Turn in a clockwise direction to reduce the gas ow Air shutters have been factory set open according to the chart below These settings are...

Страница 25: ...LANT 39 W175 0166 5 COUPLER 39 W175 0002 8 COUPLER 40 L42K LOUVRE KIT UPPER LOWER BLACK 40 L42PB LOUVRE KIT UPPER LOWER POLISHED BRASS 40 L42SS LOUVRE KIT UPPER LOWER BRUSHED STAINLESS STEEL 41 GDOI42...

Страница 26: ...26 W415 0381 H 12 07 07...

Страница 27: ...le and valve connection replace thermocouple replace valve Faulty valve replace Pilot burning no gas to main burner gas knob is on HI wall switch thermostat is on Thermostat or switch is defec tive co...

Страница 28: ...door gasketing is not broken or missing and that the seal is tight check that both 5 and 8 vent liners are free of holes and well sealed at all joints check that minimum rise per foot has been adhered...

Отзывы: