8
Zetasinter System
®
Temprature controller
Turn ON
Turn ON
Lock
Cycle
Left, Down, Up arrows
Selection screen
T/time screen
-
For the first heating, the furnace chamber must be
“
baked
”
for 2 hours at 300
℃
. Using the
temperature controller, program and run the "baking" cycle (cf. Temperature controller chapter):
(C01=50; t01=85; C02=300; t02=120; C03=300; t03=65; C04=100; t04=-121)
-
For the first high temperature heating (above 400°C), heating element must be
“
passivated
”
for 2
hours at 1200°C (cf. heating element chapter). Using the temperature controller, program and run
the "passivation" cycle:
(C01=50 ; t01=385 ; C02=1200; t02=120; C03=1200; t03=365; C04=100; t04=-121)
-
Install the vacuum pump and the flowmeter (cf. Vacuum pump & flowmeter chapter).
-
Install the bubbler (cf. Bubbler chapter).
Содержание Zetasinter
Страница 12: ...12 Zetasinter System Specific settings Time Setting Heating programs saving ...
Страница 16: ...16 Zetasinter System Install the right flange inlet flange 1 2 3 4 5 Install the left flange outlet flange ...
Страница 26: ...26 Zetasinter System 11 Electrical schematic diagram 220V Electrical schematic diagram ...