7
Zetasinter System
®
4.
Assembling
-
Install the furnace according to the facility guide.
-
Remove the plastic cover from the heating elements under the top cover (remove the screws to do
this).
-
Install the alumina tube. Put the refractory blocks on both sides of the tube (cf. Alumina tube
chapter).
-
Close the circuit breaker, turn on the power
→
the green light comes on and the cooling fan starts to
work.
-
Turn the
“
lock
”
button clockwise
→
the temperature control unit is now switched on.
-
Press the
“
Turn On
”
button (green light is now on).
Danger due to electrical current.
During installation and maintenance
work, the electric supply to the furnace
must be switched off.
Work on the electrical equipment may
only
be
performed
by
qualified
personnel.
Содержание Zetasinter
Страница 12: ...12 Zetasinter System Specific settings Time Setting Heating programs saving ...
Страница 16: ...16 Zetasinter System Install the right flange inlet flange 1 2 3 4 5 Install the left flange outlet flange ...
Страница 26: ...26 Zetasinter System 11 Electrical schematic diagram 220V Electrical schematic diagram ...