S-24
05-E3B, 05-E3BG, WSM
DIESEL ENGINE
Nozzle Holder
1. Secure the nozzle retaining nut (7) with a vise.
2. Remove the nozzle holder (1), and take out parts inside.
(When reassembling)
• Assemble the nozzle in clean fuel oil.
• Install the push rod (4), noting its direction.
• After assembling the nozzle, be sure to adjust the fuel injection
pressure.
W1018491
(5) Electrical System
CAUTION
• To avoid accidental short circuit, be sure to attach the positive cable to the positive terminal before the
negative cable is attached to the negative terminal.
• Never remove the battery cap while the engine is running.
• Keep electrolyte away from eyes, hands and clothes. If you are spattered with it, wash it away completely
with water immediately.
• Keep open sparks and flames away from the battery at all times. Hydrogen gas mixed with oxygen
becomes very explosive.
IMPORTANT
■
• If the machine is to be operated for a short time without battery (using a slave battery for starting), use
additional current (lights) while engine is running and insulate terminal of battery. If this advice is
disregarded, damage to alternator and regulator may result.
Battery Voltage
1. Stop the engine.
2. Measure the voltage with a circuit tester between the battery
terminals.
3. If the battery voltage is less than the factory specification, check
the battery specific gravity and recharge the battery.
W10125620
Tightening torque
Nozzle holder
35 to 39 N·m
3.5 to 4.0 kgf·m
26 to 28 lbf·ft
Overflow pipe retaining nut
20 to 24 N·m
2.0 to 2.5 kgf·m
15 to 18 lbf·ft
Nozzle holder assembly
49 to 68 N·m
5.0 to 7.0 kgf·m
36 to 50 lbf·ft
(1) Nozzle Holder
(2) Adjusting Washer
(3) Nozzle Spring
(4) Push Rod
(5) Distance Piece
(6) Nozzle Piece
(7) Nozzle Retaining Nut
Battery voltage
Factory spec.
More than 12 V
(1) Positive Terminal
(2) Negative Terminal
KiSC issued 12, 2007 A