background image

THREE YEAR COVERAGE.

 

For three (3) years from Delivery, NanaWall will respond as follows:

Anodized Surface Finish of Aluminum Profiles.

 For anodized surface finish of aluminum profile not functioning as 

an ESM,* NanaWall will, at its option, (1) assume reasonable costs to restore the finish on a non-compliant (non-ESM) 
material using standard commercial refinishing techniques or (2) ship a replacement part.

ONE YEAR COVERAGE.

 

For one (1) year from Delivery, NanaWall will respond as follows:

Screens.

 For a screen part (excluding the screen mesh) with a material or workmanship issue that substantially impairs 

the function of the screen, NanaWall will, at its option, (1) ship a replacement screen or (2) upon return by owner, repair 
the screen without charge.

ADDITIONAL SERVICE INFORMATION

This Warranty does not cover labor costs to remove existing parts or products, install a replacement part or product, costs 
to finish wood products, or the cost to repair or replace surrounding substrates, trim, or other work. Nor does it cover 
costs incurred due to delays or other construction costs, costs for late or damaged delivery, loss of revenue, loss of time, 
liquidated damages, inconvenience, or loss of use of the product or any parts or components. NanaWall reserves the right 
to determine whether or not a covered condition exists. If the claim is not covered under this Warranty, NanaWall may 
charge and collect a fee for on-site product inspections.

Any replacement part or product will be shipped to the location of original product delivery by NanaWall. Replacement 
products will be the closest equivalent current product and may not be an exact match to the original. If providing a 
replacement part or product is not commercially practicable, NanaWall may elect to refund the purchase price of the 
affected product in full satisfaction of its obligations. 

Wood.

 Wood components must be properly finished on all sides promptly after receipt of unit before installation of unit, 

and prior to exposure to weather. Repair or replacement of a warped wood panel or frame can be delayed by up to 12 
months from date of claim to allow the wood component to adjust to local environmental conditions. 

Glass.

 Unloading the replacement glass/panel from the delivery truck is the responsibility of the owner. Due to the 

weight of the product, appropriate manpower and/or equipment will be needed to unload and move the glass/panel to 
the location for replacement. Depending on the size of the replacement part and interior building dimensions, it may not 
be possible to transport the glass/panel through the interior of the building. NanaWall is not responsible for any costs 
associated with moving the replacement glass/panel at the delivery location.

**Whether an installer is an independent NanaWall Certified Installer or Approved Installer is determined by the installer’s 
status as of the date of delivery. NanaWall maintains information regarding the installers designated as Certified Installers 
or Approved Installers.

NOTICE PROCESS

Written notice of any claim under this Warranty with supporting documents such as photos or videos must be given to 
Nana Wall Systems, Inc. via email to [email protected] or via mail to 100 Meadowcreek Drive, Corte Madera, CA 
94925, promptly when discovered. A condition will not be covered under this Warranty if there is a failure to notify 
NanaWall in writing (1) within 7 days of receipt of the product for any defect which an ordinary inspection would reveal, 
(2) within a reasonable time during the warranty period after an impairment in operation and use is manifest or a hidden 
defect is discovered, or (3) for claims first made after expiration of the coverage period outlined in this Warranty. 

NANAWALL LIMITED WARRANTY

PAGE 2 OF 4

Содержание WD65

Страница 1: ...5 Wood Framed Top Hung Folding System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through NanaWal...

Страница 2: ...is shipped with all necessary components However not included are screws bolts shims etc to anchor the unit to the rough opening The frame is shipped knocked down and needs to be assembled Panels are...

Страница 3: ...e into consideration the following 1 The structural integrity of the header is critical for proper operation Vertical deflection of the header under full live and dead loads should be the lesser of L...

Страница 4: ...roof etc be constructed before a unit is installed Properly flash and waterproof around the perimeter of the opening especially at the sill Make sure you seek proper professional advice for the approp...

Страница 5: ...stomer s specific application requirements can be evaluated Your local paint professional should know of suitable finish systems that give satisfactory results in your region It is highly recommended...

Страница 6: ...ead jamb and sill regarding their length provided in segments then connect them first If a unit has angle changes in the floor plan then separate information will be supplied Make sure that the frame...

Страница 7: ...ts Use appropriate screws or other equivalent anchorage devices depending on the adjacent substrate material and construction Make sure they are corrosion resistant Anchorage devices should penetrate...

Страница 8: ...the pre drilled holes and shims Make sure that the head jamb is level IMPORTANT Make sure no shims are forced to ensure that frame sections are not bowed Check frame constantly to be certain that it i...

Страница 9: ...scale Details shown are subject to change without notice Note Contact us for detailed information OUTWARD OPENING PANEL HINGED AT RIGHT SIDE JAMB INWARD OPENING PANEL HINGED AT RIGHT SIDE JAMB STANDAR...

Страница 10: ...eck to make sure that the panel is vertically straight Step B4 If there are additional panels to be attached to the folding pair close the pair by turning the handle 180 Step B5 Attach additional pane...

Страница 11: ...ior grade sealant with a backer rod if needed on the joint between the sill and sub floor on both sides along the length of the sill Do similar for the gaps between the head jamb and side jambs with t...

Страница 12: ...curity and weather resistance When closed please engage all locking mechanisms fully The correct sequence of opening and closing of panels is dependent on the configuration ordered Panels must be open...

Страница 13: ...side or a thumb turn on the inside Unlock and disengaging the locking points Unlock the lock with key or thumb turn By operating the door handle downwards the locking points at the top and the bottom...

Страница 14: ...al loading and forced entry 5 Periodically inspect the sealant caulking on the exterior perimeter of the unit It is extremely important that the sealant caulking remains intact and in good condition T...

Страница 15: ...jamb tracks should be free from all dirt and debris c There should be no standing water in the track in the sill d All hardware should be intact and operating properly 2 All surfaces must be cleaned w...

Страница 16: ...ments of ASTM E 774 Class A B or C Although glass installation with the dry glazing system is relatively straight forward it is recommended that an experienced glazing contractor be used It is very im...

Страница 17: ...n the upper rail on the same corner as the other upper setting block To get a proper fit shift the glass weight by lifting the panel up with a plastic pry bar at the lower corner below the upper setti...

Страница 18: ...lightly higher in the upper corner with the setting blocks it is okay If not then the lower and upper setting blocks thickness need to be adjusted Panels have to be braced correctly for proper operati...

Страница 19: ...antial cracking chipping or peeling due to the deterioration of the finish exclusive of mechanical damage 2 chalking in excess of a numerical rating of 8 as per ASTM D 659 or 3 fading or color changes...

Страница 20: ...e of the affected product in full satisfaction of its obligations Wood Wood components must be properly finished on all sides promptly after receipt of unit before installation of unit and prior to ex...

Страница 21: ...Product selection application storage handling modification or waterproofing Movement of surrounding substrates including deflection of the header of more than or any other stresses on product Instal...

Страница 22: ...faces Acts of God falling objects fire accidents external forces or other conditions beyond NanaWall s control Gas fill or retention levels in insulated glass units Field testing of Product Performanc...

Страница 23: ...___________________________________ Project Address if different from above _____________________________________________________________ INSTALLATION Installer Name _______________________________ Ad...

Отзывы: