background image

NANAWALL WD65 OWNER’S MANUAL

12 

Operation And Maintenance 
Of NanaWall Products

OPERATION OF A NANAWALL FOLDING UNIT 

For opening and closing the folding system, please 
observe the special notes on the following pages in as far 
as they relate to your folding system.

When operating the folding system similar to 
any other door, please do not place your fingers 
between the panels/pivot points. You may hurt 
them!  

Do not have anyone not properly trained on operation 
and children operate the unit. 

Do not force the system if not operating properly.  
Please have it repaired as soon as possible by a qualified 
technician. 

Anchor panels when in the open position to prevent 
uncontrolled movement, especially in windy conditions, 
that might cause damage and injury. 

It is highly recommended that if not used, the NanaWall 
folding unit be kept closed as much as possible, in order 
to provide best security and weather resistance. When 
closed, please engage all locking mechanisms fully. 

The correct sequence of opening and closing of panels is 
dependent on the configuration ordered. Panels must be 
opened and closed in the right order.

With a Swing Panel Attached to a Folding Pair

1.

Open the swing panel a full 180

° 

and connect

 

to the 

panel catch on the adjacent panel.

2.

Disengage the locking points on all the other panels.

3.

Slide folding panels, starting with the pair adjacent to

 

the swing panel.

For closing, proceed in reverse order.

Without a Swing Panel

1.

Disengage locking points on primary opening panel
pair and fold it slightly.

2. Do the same with any adjacent panel pair.

3. Slide folding panels completely to the side.

For closing, proceed in reverse order.

With Unhinged Paired Panels and No Swing Panel

1.

Disengage locking points on primary opening panel
pair and fold it slightly.

2. Do the same with any adjacent panel pair (s).

3. Slide folding panels into desired stacking position.

For closing

,

 proceed in reverse order.

1

1

2

2

3

3

2

1

2

3

1

1

2

2

3

3

2

1

2

3

1

1

2

2

3

3

2

1

2

3

Содержание WD65

Страница 1: ...5 Wood Framed Top Hung Folding System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through NanaWal...

Страница 2: ...is shipped with all necessary components However not included are screws bolts shims etc to anchor the unit to the rough opening The frame is shipped knocked down and needs to be assembled Panels are...

Страница 3: ...e into consideration the following 1 The structural integrity of the header is critical for proper operation Vertical deflection of the header under full live and dead loads should be the lesser of L...

Страница 4: ...roof etc be constructed before a unit is installed Properly flash and waterproof around the perimeter of the opening especially at the sill Make sure you seek proper professional advice for the approp...

Страница 5: ...stomer s specific application requirements can be evaluated Your local paint professional should know of suitable finish systems that give satisfactory results in your region It is highly recommended...

Страница 6: ...ead jamb and sill regarding their length provided in segments then connect them first If a unit has angle changes in the floor plan then separate information will be supplied Make sure that the frame...

Страница 7: ...ts Use appropriate screws or other equivalent anchorage devices depending on the adjacent substrate material and construction Make sure they are corrosion resistant Anchorage devices should penetrate...

Страница 8: ...the pre drilled holes and shims Make sure that the head jamb is level IMPORTANT Make sure no shims are forced to ensure that frame sections are not bowed Check frame constantly to be certain that it i...

Страница 9: ...scale Details shown are subject to change without notice Note Contact us for detailed information OUTWARD OPENING PANEL HINGED AT RIGHT SIDE JAMB INWARD OPENING PANEL HINGED AT RIGHT SIDE JAMB STANDAR...

Страница 10: ...eck to make sure that the panel is vertically straight Step B4 If there are additional panels to be attached to the folding pair close the pair by turning the handle 180 Step B5 Attach additional pane...

Страница 11: ...ior grade sealant with a backer rod if needed on the joint between the sill and sub floor on both sides along the length of the sill Do similar for the gaps between the head jamb and side jambs with t...

Страница 12: ...curity and weather resistance When closed please engage all locking mechanisms fully The correct sequence of opening and closing of panels is dependent on the configuration ordered Panels must be open...

Страница 13: ...side or a thumb turn on the inside Unlock and disengaging the locking points Unlock the lock with key or thumb turn By operating the door handle downwards the locking points at the top and the bottom...

Страница 14: ...al loading and forced entry 5 Periodically inspect the sealant caulking on the exterior perimeter of the unit It is extremely important that the sealant caulking remains intact and in good condition T...

Страница 15: ...jamb tracks should be free from all dirt and debris c There should be no standing water in the track in the sill d All hardware should be intact and operating properly 2 All surfaces must be cleaned w...

Страница 16: ...ments of ASTM E 774 Class A B or C Although glass installation with the dry glazing system is relatively straight forward it is recommended that an experienced glazing contractor be used It is very im...

Страница 17: ...n the upper rail on the same corner as the other upper setting block To get a proper fit shift the glass weight by lifting the panel up with a plastic pry bar at the lower corner below the upper setti...

Страница 18: ...lightly higher in the upper corner with the setting blocks it is okay If not then the lower and upper setting blocks thickness need to be adjusted Panels have to be braced correctly for proper operati...

Страница 19: ...antial cracking chipping or peeling due to the deterioration of the finish exclusive of mechanical damage 2 chalking in excess of a numerical rating of 8 as per ASTM D 659 or 3 fading or color changes...

Страница 20: ...e of the affected product in full satisfaction of its obligations Wood Wood components must be properly finished on all sides promptly after receipt of unit before installation of unit and prior to ex...

Страница 21: ...Product selection application storage handling modification or waterproofing Movement of surrounding substrates including deflection of the header of more than or any other stresses on product Instal...

Страница 22: ...faces Acts of God falling objects fire accidents external forces or other conditions beyond NanaWall s control Gas fill or retention levels in insulated glass units Field testing of Product Performanc...

Страница 23: ...___________________________________ Project Address if different from above _____________________________________________________________ INSTALLATION Installer Name _______________________________ Ad...

Отзывы: