background image

NanaWall Limited Warranty

NanaWall is pleased to provide the following warranty to the owner of NanaWall products, including the initial purchaser 
and all subsequent owners (“Owner”), subject to all terms and conditions stated herein. This Warranty supersedes all 
previous product warranties and is the exclusive statement of all commitments and rights of NanaWall with respect to its 
products sold on or after May 1, 2022, to be installed in the United States (excluding territories) or Canada.

NanaWall shall have no obligation to respond under this Warranty until receipt of proper notice of a claim and an 
opportunity to respond. Upon notice and confirmation by NanaWall of a condition covered under this Warranty, NanaWall 
will respond in good faith and in a timely manner as follows:

TEN YEAR COVERAGE.

 

For ten (10) years from the date of delivery by NanaWall (“Delivery”), NanaWall will respond as follows:

Insulated Glass.

 For an insulated glass unit with a permanent material obstruction of vision due to a premature failure of 

the glass seal, NanaWall will ship a replacement glass unit or panel. Exception: insulated glass units for cero® are covered 
for five (5) years from Delivery.

Powder Coat or Baked-on Fluoropolymer Surface Finish of Aluminum Profiles. 

For powder coat or baked-on 

fluoropolymer surface finish not functioning as an Effective Surface Material (“ESM”*), NanaWall will, at its option, 
(1) assume reasonable costs to restore the finish using standard commercial refinishing techniques or
(2) ship replacement parts. Uneven fading is not a covered condition due to environmental variables.

*An ESM is a finish without (1) substantial cracking, chipping, or peeling due to the deterioration of the finish (exclusive of
mechanical damage); (2) chalking in excess of a numerical rating of 8 as per ASTM D 659; or (3) fading or color changes
in excess of 5 NBS units as per ASTM D 2244.

Rollers.

 For a roller with material or workmanship issues that significantly impair proper operation and function, 

NanaWall will ship a replacement roller.  

Wood and Other Remaining Components

 

(for product installed by an independent NanaWall Certified Installer or 

Approved Installer**)

. For all remaining components of NanaWall products not otherwise addressed herein with a material 

or workmanship issue that substantially impairs operation and function, NanaWall will, at its option, (1) ship a replacement 
part or product or (2) ship any replacement part or replacement product in the same stage of fitting and/or finishing as 
originally supplied by NanaWall. This includes wood frame components, hinges, handles, locking mechanisms, tracks, 
beads, and weather-stripping.

FIVE YEAR COVERAGE.

 

For five (5) years from Delivery, NanaWall will respond as follows:

Laminated Glass.

 For a laminated glass unit with permanent material obstruction of vision due to premature delamination, 

NanaWall will ship a replacement glass unit or panel.

Wood and Other Remaining Components 

(for product NOT installed by an independent NanaWall Certified Installer or 

Approved Installer**)

. For all remaining components of NanaWall products not otherwise addressed herein with a material 

or workmanship issue that substantially impairs operation and function, NanaWall will ship a replacement part or product 
without charge in the same stage of fitting and/or finishing as originally supplied by NanaWall. This includes wood frame 
components, hinges, handles, locking mechanisms, tracks, and weather-stripping.

PAGE 1 OF 4

Содержание WD65

Страница 1: ...5 Wood Framed Top Hung Folding System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through NanaWal...

Страница 2: ...is shipped with all necessary components However not included are screws bolts shims etc to anchor the unit to the rough opening The frame is shipped knocked down and needs to be assembled Panels are...

Страница 3: ...e into consideration the following 1 The structural integrity of the header is critical for proper operation Vertical deflection of the header under full live and dead loads should be the lesser of L...

Страница 4: ...roof etc be constructed before a unit is installed Properly flash and waterproof around the perimeter of the opening especially at the sill Make sure you seek proper professional advice for the approp...

Страница 5: ...stomer s specific application requirements can be evaluated Your local paint professional should know of suitable finish systems that give satisfactory results in your region It is highly recommended...

Страница 6: ...ead jamb and sill regarding their length provided in segments then connect them first If a unit has angle changes in the floor plan then separate information will be supplied Make sure that the frame...

Страница 7: ...ts Use appropriate screws or other equivalent anchorage devices depending on the adjacent substrate material and construction Make sure they are corrosion resistant Anchorage devices should penetrate...

Страница 8: ...the pre drilled holes and shims Make sure that the head jamb is level IMPORTANT Make sure no shims are forced to ensure that frame sections are not bowed Check frame constantly to be certain that it i...

Страница 9: ...scale Details shown are subject to change without notice Note Contact us for detailed information OUTWARD OPENING PANEL HINGED AT RIGHT SIDE JAMB INWARD OPENING PANEL HINGED AT RIGHT SIDE JAMB STANDAR...

Страница 10: ...eck to make sure that the panel is vertically straight Step B4 If there are additional panels to be attached to the folding pair close the pair by turning the handle 180 Step B5 Attach additional pane...

Страница 11: ...ior grade sealant with a backer rod if needed on the joint between the sill and sub floor on both sides along the length of the sill Do similar for the gaps between the head jamb and side jambs with t...

Страница 12: ...curity and weather resistance When closed please engage all locking mechanisms fully The correct sequence of opening and closing of panels is dependent on the configuration ordered Panels must be open...

Страница 13: ...side or a thumb turn on the inside Unlock and disengaging the locking points Unlock the lock with key or thumb turn By operating the door handle downwards the locking points at the top and the bottom...

Страница 14: ...al loading and forced entry 5 Periodically inspect the sealant caulking on the exterior perimeter of the unit It is extremely important that the sealant caulking remains intact and in good condition T...

Страница 15: ...jamb tracks should be free from all dirt and debris c There should be no standing water in the track in the sill d All hardware should be intact and operating properly 2 All surfaces must be cleaned w...

Страница 16: ...ments of ASTM E 774 Class A B or C Although glass installation with the dry glazing system is relatively straight forward it is recommended that an experienced glazing contractor be used It is very im...

Страница 17: ...n the upper rail on the same corner as the other upper setting block To get a proper fit shift the glass weight by lifting the panel up with a plastic pry bar at the lower corner below the upper setti...

Страница 18: ...lightly higher in the upper corner with the setting blocks it is okay If not then the lower and upper setting blocks thickness need to be adjusted Panels have to be braced correctly for proper operati...

Страница 19: ...antial cracking chipping or peeling due to the deterioration of the finish exclusive of mechanical damage 2 chalking in excess of a numerical rating of 8 as per ASTM D 659 or 3 fading or color changes...

Страница 20: ...e of the affected product in full satisfaction of its obligations Wood Wood components must be properly finished on all sides promptly after receipt of unit before installation of unit and prior to ex...

Страница 21: ...Product selection application storage handling modification or waterproofing Movement of surrounding substrates including deflection of the header of more than or any other stresses on product Instal...

Страница 22: ...faces Acts of God falling objects fire accidents external forces or other conditions beyond NanaWall s control Gas fill or retention levels in insulated glass units Field testing of Product Performanc...

Страница 23: ...___________________________________ Project Address if different from above _____________________________________________________________ INSTALLATION Installer Name _______________________________ Ad...

Отзывы: