UNIT INSTALLATION 

The Installation of the unit is described 
in the Installation Manual:

Sheet 1.   Required Tools
Sheet 2.   Rough Opening and Unit Dimensions
Sheet 3.   Head Track in “kd” (knocked down) Condition
Sheet 4.  Head Track Connector for Side Jambs
Sheet 5.   Assembly of Head Track
Sheet 6.   Head Track Shimming
Sheet 7.   Installation Sequence of Panels
Sheet 8.   Panel Alignment and Height Adjustment
Sheet 9:  Single Action Offset End Panel Adjustment
Sheet 10.   Drilling Holes for Floor Sockets 
Sheet 11.   Offset Pivot Point and Floor Closer 

 for Single Action Offset End Panel

Sheet 12.   Field Applying Vertical H- and h-gaskets 

 and Height Adjustment of Bottom

 

Compression Seal

Sheet 13.  Installation of Mortise Cylinder (on Inside, only)

A. FRAME ASSEMBLY AND INSTALLATION 

 

Since there can be an infinite number of variations of 
stacking options and configurations, it is not possible to 
have step by step specific instructions that will apply to all 
units installed. Below are general instructions that focus 
on the installation of a 3 panel unit as shown in 

Diagram 1

This may not exactly apply to your particular unit. Please 
refer to the Custom Product Drawings for your specific 
project.

The key to having a properly installed and 
operating PrivaSEE system is to install a 
perfectly plumb, level and square frame at 
the correct height from the level finish floor, 
then after the panels are installed, install the 
adjustable floor sockets such that they are 
precisely aligned to the panel locking.

Step A1

 

Look for the labels on the different upper track segments, 
side jambs and sill segments and set them on the floor as 
per the layout on the product drawing.

Step A2

 

Attach as many of the upper track pieces together that 
could be supported and installed easily as one piece. Use 
the connectors and set screws provided. 

See Sheet 5 of 

the Installation Manual.

 Make sure that the correct angles 

between segments are maintained and that the transitions 
between the track segments are perfectly aligned and 
smooth.

Step A3

 

Add the top connector pieces for the side jambs on both 
ends of the top track. Add some caulking to the top cover 
plate and fix it to the top track from the side.

Step A4

 

The roller access head track section is a removable 
section in the head track (RHT). This section will need to 
be later removed when the panels are installed.

Step A5

 

The head track is pre-drilled in the factory with anchorage 
holes at spacing’s of about 10” (250 mm) for 5/16” (8 mm) 
diameter screws or bolts. 

See Sheet 3 of the Installation 

Manual.

The correct fastener spacing in the support structure 
within the opening depends on substrate material, design 
windload pressures of project, panel height and other 
requirements of the project. 

All anchoring details and 

requirements should be determined and verified by the 
project structural engineer

. Please pre-drill any additional 

anchorage holes as needed.

The spacing of anchorage devices in the stacking bay 
should be every 4” (100 mm) and in the stacking route 
every about 10” (250 mm). Please pre-drill any additional 
anchorage holes as needed.

NANAWALL PRIVASEE OWNER’S MANUAL

PAGE 6 OF 15

Содержание PrivaSEE

Страница 1: ...vaSEE Single Track Sliding Frameless System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through N...

Страница 2: ...ass thickness for the panels is based on the Glass Association of North America GANA recommended minimum glass thickness for fully tempered Interior butt glazed fixed glass panels The PrivaSEE system...

Страница 3: ...g Panel Sliding Panel Maximum Unit Height 10 6 3200mm 10 6 3200mm 10 6 3200mm Maximum Panel Width 3 7 1100mm 4 1 1250mm 4 1 1250mm 1 A Binder 3 P Sound D DIAGRAM 1 EXAMPLE OF A 3 PANEL UNIT in this ca...

Страница 4: ...ially to the edges of panels PREPARATION OF THE OPENING AND SUPPORT STRUCTURE ABOVE Make rough opening width at least 1 2 wider on either side than the outside unit frame width and rough opening heigh...

Страница 5: ...support structure to be used in your particular application 5 The rough opening should be reasonably level plumb and square at all points There should be no unevenness or bowing Make sure that the hea...

Страница 6: ...ligned to the panel locking Step A1 Look for the labels on the different upper track segments side jambs and sill segments and set them on the floor as per the layout on the product drawing Step A2 At...

Страница 7: ...ar manner Make certain that the angles between different upper track components are exact If the stacking bay has parallel legs make sure that the legs are exactly parallel IMPORTANT ADJUST EACH ANCHO...

Страница 8: ...this dimension on the floor as well Step B2 Take off the side jamb and make sure that you keep the correct shim space and horseshoe shims for each anchoring point Unscrew the bottom hinge from the sid...

Страница 9: ...ft enough space for the single action offset end panels or non entry offset end panels See Sheet 9 of the Installation Manual Between panels there should be an even gap of about 5 32 4mm from top to b...

Страница 10: ...ocket holes If concrete use a diamond core drill bit with the proper diameter size Step E4 Slide the proper sockets into the holes If necessary use suitable material to fix them in place F INSTALLATIO...

Страница 11: ...hinge with the pivot box attached to the top track Line up both hinges and connect them with the hinge pin Secure the hinge pin from the side with the set screw Close the single action end panel or no...

Страница 12: ...ngress and egress by tradesmen should be resisted Operation and Maintenance of Nanawall Products OPERATION OF A NANAWALL PRIVASEE SINGLE TRACK SLIDING SYSTEM For opening and closing the single track s...

Страница 13: ...ls from the stacking bay you will need to grasp panels by the edges with one hand as high as possible Move evenly and keep sliding panels as vertical as possible Avoid any pendulum movements 8 Make su...

Страница 14: ...moved with mineral spirits Heavier accumulations can be removed with a mild solution of household detergent For all surfaces aggressive alkaline or acid cleaners should not be used Excessive abrasive...

Страница 15: ...tions for Flat Glass for quality thickness and dimensional tolerances Tempered float glass shall meet the current requirements of ASTM C 1048 Standard Specifications for Heat Treated Flat Glass Kind H...

Страница 16: ...not otherwise addressed in this Warranty are warranted against defects in materials and workmanship that substantially impair operation and function for a period of 10 years from Delivery This include...

Страница 17: ...e for on site product inspections NOTICE PROCESS Written notice of any claim under this Warranty with supporting documents such as photos or videos must be given to Nana Wall Systems Inc 100 Meadowcre...

Страница 18: ...vision and cannot be detected from within 10 feet as per ASTM C 1036 Accidental or spontaneous glass breakage Glass breakage due to thermal stresses Film applied to the glass surface Industry accepte...

Страница 19: ...________________ Project Address if different from above ________________________________________________________________________ INSTALLATION Installer Name ________________________________________ A...

Отзывы: