background image

NANAWALL PRIVASEE OWNER’S MANUAL

PAGE 10 OF 15

After final adjustments make sure to tighten down the 
set screw to secure the bolt/axle from turning.

Step D3

 

After you adjusted all sliding panels, measure the width 
for the single action offset end panel or non-entry offset 
end panel again and make sure it fits into the opening. 

See Sheet 9 of the Installation Manual.

Now you can start drilling holes for sockets! Do not 
install the single action offset end panels or non-entry 
offset end panels, yet!

 

E. SOCKETS

 

Holes in the floor for the sockets have to be made at 
exact precise spots. There is no second chance if the 
hole/slot location is off. 

See Sheet 10 of the Installation 

Manual.

Step E1

 

With a laser, find the center line of the head track on the 
floor along the length of the opening, and mark it with a 
chalk line. Close the unit such that the panels are in the 
correct closed position. Make sure the panels are straight 
and the correct 3/16” (4 mm) gap between panels is 
maintained.

Step E2

 

Start with the panel furthest away from the parking bay 
and add blue masking tape underneath the approximate 
location of the locking bolts. Slowly and carefully engage 
the locking points until it touches the tape. The tip of the 
locking bolts should make a mark on the blue tape that 
would be the center point of the socket hole.

Step E3

 

From the custom product drawings and the locking type 
on the panels, drill the appropriate size socket holes. If 
concrete, use a diamond core drill bit with the proper 
diameter size.

Step E4

 

Slide the proper sockets into the holes. If necessary, use 
suitable material to fix them in place.

 

F. INSTALLATION OF SINGLE ACTION OFFSET 
END PANEL WITH FLOOR CLOSER

Step F1

 

After you adjusted all sliding panels, measure the width of 
the single action offset end panel again and make sure it 
fits into the opening. 

Step F2

 

Take the top hinge pin for the single action offset end 
panel out of the accessory box. Slide it inside the top 
offset hinge on the panel and make sure that the set 
screw is loose and allows the pin to slide in with ease.

Step F3

 

To install the panel, please lift the panel up and position 
the center of the axle of the bottom hinge installed to the 
panel profile over the center of the bottom hinge fixed to 
the side jamb and lower it down. Then align the top hinge 
with the pivot box attached to the top track. Line up both 
hinges and connect them with the hinge pin. Secure the 
hinge pin from the side with the set screw. Close the 
single action offset end panel slowly and check all the 
reveals. Make sure that the panel is not binding or hitting 
the adjacent sliding panel. 

For height adjustments, please use the screws inside of 
the cement box surrounding the body of the floor closer.

For adjustments in width, please loosen the 2 screws at 
the top holding the pivot box in place.

Step F4

 

Before you finally tighten down all screws, make sure that 
all dimensions are set correct, the panel can be opened 
and closed with the right clearance and check if the panel 
is plumb and level. The last steps are to screw on the 

Содержание PrivaSEE

Страница 1: ...vaSEE Single Track Sliding Frameless System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through N...

Страница 2: ...ass thickness for the panels is based on the Glass Association of North America GANA recommended minimum glass thickness for fully tempered Interior butt glazed fixed glass panels The PrivaSEE system...

Страница 3: ...g Panel Sliding Panel Maximum Unit Height 10 6 3200mm 10 6 3200mm 10 6 3200mm Maximum Panel Width 3 7 1100mm 4 1 1250mm 4 1 1250mm 1 A Binder 3 P Sound D DIAGRAM 1 EXAMPLE OF A 3 PANEL UNIT in this ca...

Страница 4: ...ially to the edges of panels PREPARATION OF THE OPENING AND SUPPORT STRUCTURE ABOVE Make rough opening width at least 1 2 wider on either side than the outside unit frame width and rough opening heigh...

Страница 5: ...support structure to be used in your particular application 5 The rough opening should be reasonably level plumb and square at all points There should be no unevenness or bowing Make sure that the hea...

Страница 6: ...ligned to the panel locking Step A1 Look for the labels on the different upper track segments side jambs and sill segments and set them on the floor as per the layout on the product drawing Step A2 At...

Страница 7: ...ar manner Make certain that the angles between different upper track components are exact If the stacking bay has parallel legs make sure that the legs are exactly parallel IMPORTANT ADJUST EACH ANCHO...

Страница 8: ...this dimension on the floor as well Step B2 Take off the side jamb and make sure that you keep the correct shim space and horseshoe shims for each anchoring point Unscrew the bottom hinge from the sid...

Страница 9: ...ft enough space for the single action offset end panels or non entry offset end panels See Sheet 9 of the Installation Manual Between panels there should be an even gap of about 5 32 4mm from top to b...

Страница 10: ...ocket holes If concrete use a diamond core drill bit with the proper diameter size Step E4 Slide the proper sockets into the holes If necessary use suitable material to fix them in place F INSTALLATIO...

Страница 11: ...hinge with the pivot box attached to the top track Line up both hinges and connect them with the hinge pin Secure the hinge pin from the side with the set screw Close the single action end panel or no...

Страница 12: ...ngress and egress by tradesmen should be resisted Operation and Maintenance of Nanawall Products OPERATION OF A NANAWALL PRIVASEE SINGLE TRACK SLIDING SYSTEM For opening and closing the single track s...

Страница 13: ...ls from the stacking bay you will need to grasp panels by the edges with one hand as high as possible Move evenly and keep sliding panels as vertical as possible Avoid any pendulum movements 8 Make su...

Страница 14: ...moved with mineral spirits Heavier accumulations can be removed with a mild solution of household detergent For all surfaces aggressive alkaline or acid cleaners should not be used Excessive abrasive...

Страница 15: ...tions for Flat Glass for quality thickness and dimensional tolerances Tempered float glass shall meet the current requirements of ASTM C 1048 Standard Specifications for Heat Treated Flat Glass Kind H...

Страница 16: ...not otherwise addressed in this Warranty are warranted against defects in materials and workmanship that substantially impair operation and function for a period of 10 years from Delivery This include...

Страница 17: ...e for on site product inspections NOTICE PROCESS Written notice of any claim under this Warranty with supporting documents such as photos or videos must be given to Nana Wall Systems Inc 100 Meadowcre...

Страница 18: ...vision and cannot be detected from within 10 feet as per ASTM C 1036 Accidental or spontaneous glass breakage Glass breakage due to thermal stresses Film applied to the glass surface Industry accepte...

Страница 19: ...________________ Project Address if different from above ________________________________________________________________________ INSTALLATION Installer Name ________________________________________ A...

Отзывы: