background image

Nana Wall Systems, Inc.
100 Meadowcreek Drive #250
Corte Madera, CA 94925

800 873 5673
415 383 3148
Fax 415 383 0312

[email protected]
nanawall.com

©2022 Nana Wall Systems, Inc.

NanaWall Warranty Registration

Must be filled out and returned to Nana Wall Systems, Inc., 100 Meadowcreek Drive, Corte Madera, CA 94925 
within 30 days from date of purchase of the NanaWall in order for the limited warranty to become effective.

NANAWALL ORDER #

 ________________________

PROJECT NAME 

 _____________________________

Date of Purchase

 _____________________________

Purchaser Name 

 ______________________________

PROPERTY OWNER

Name 

 _____________________________________

 Address 

 ____________________________________

Telephone 

 _________________________________

 E-mail 

 ______________________________________

Project Address (if different from above) 

 ____________________________________________________________

INSTALLATION

Installer Name 

 ______________________________

Address 

 ____________________________________

Telephone 

 _________________________________

E-mail 

 ______________________________________

Type of project 

new residential

restaurant

shopping mall

residential remodel

office building

other 

 ___________________________

Architect Name 

 _____________________________

Address 

 ____________________________________

1. Is the installation complete?

yes

If yes, date completed 

 ________________

no

If no, date scheduled 

 _________________

2. Have you been shown how to

yes

Is operation satisfying?    

 

yes     

 

no

operate your new NanaWall?

no

If no, why not? 

 ________________________________

Print Name

 _________________________________

Signature

 __________________________________

Date 

 _______________________________________

Содержание HSW75

Страница 1: ...ingle Track Sliding Frameless System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through NanaWall...

Страница 2: ...s of glass The NanaWall glass thickness for the panels is based on the Glass Association of North America GANA recommended minimum glass thickness for fully tempered Interior butt glazed fixed glass p...

Страница 3: ...E OF A 5 PANEL UNIT Panel 1 sliding panel Panel 2 sliding panel Panel 3 sliding panel Panel 4 sliding panel Panel 5 double action end panel non sliding with pivot box or double action end panel non sl...

Страница 4: ...lean and dry location and protect against defacement or damage especially to the edges of panels PREPARATION OF THE OPENING AND SUPPORT STRUCTURE ABOVE Make rough opening width at least 1 2 wider than...

Страница 5: ...lable please verify the type of sockets for this order If planning to cut into a post tensioned concrete for bottom door closers pivot boxes and sockets a structural engineer and architect has to be c...

Страница 6: ...ews provided See Sheet 4 of the Installation Manual Make sure that the correct angles between segments are maintained and that the transitions between the track segments are perfectly aligned and smoo...

Страница 7: ...FORCED TO ENSURE THAT THE UPPER TRACK IS NOT BOWED Upper track segments must be joined such that they are even tight and aligned perfectly Otherwise the running carriages may wear out prematurely whic...

Страница 8: ...E HAS TO BE SECURED TO THE SOCKET IN THE PIVOT BOX IN THE FLOOR BEFORE THE SINGLE DOUBLE ACTION SLIDING PANEL CAN FUNCTION PROPERLY OTHERWISE IT WILL NOT BE STABLE AND CAN FALL AND HURT SOMEBODY C GAP...

Страница 9: ...hanism is not in the way Make sure the panels are straight and the correct 4 mm gap between panels is maintained Start with the panel furthest away from the parking bay and add blue masking tape under...

Страница 10: ...6 52 mm Please check custom product drawing for swing direction inside outside See Sheet 14 and 15 of the Installation Manual Mark this point and if concrete use a diamond core drill bit with 1 1 4 di...

Страница 11: ...ip to the edge of the wall Make sure that the full underside of the box rests on a flush and level surface and fix it temporarily into place Then install the receiver box for the top axle by hanging i...

Страница 12: ...ed Check if all angles are correct Each leg of the stacking bay track should be equidistant at all points Step F5 Correct any problems before you finish the trimming Do not attach any trimming directl...

Страница 13: ...n edge bolt with hand or foot d Automatic Locking when adjacent panels are pulled together and properly aligned the bolt automatically engages 4 Note that there is a carrier at each upper corner of a...

Страница 14: ...e head track and engages to the top rail Turn about 8 10 revolutions in a clockwise direction until there is a slight resistance 3 Release the Quick Release Lock on the pivot side to disengage the loc...

Страница 15: ...ce Its appearance may be marred by harsh chemicals abuse or neglect Frequency of cleaning depends on exposure and needs For aluminum surfaces generally warm soapy water should be sufficient Stubborn s...

Страница 16: ...licable codes and regulations Glass shall meet the current requirements of ASTM C 1306 Standard Specifications for Flat Glass for quality thickness and dimensional tolerances Tempered float glass shal...

Страница 17: ...soap and fresh water at least every month and more frequently if necessary After washing the surface should be rinsed thoroughly with clean water and allowed to dry For cleaning do not use abrasive h...

Страница 18: ...antial cracking chipping or peeling due to the deterioration of the finish exclusive of mechanical damage 2 chalking in excess of a numerical rating of 8 as per ASTM D 659 or 3 fading or color changes...

Страница 19: ...e of the affected product in full satisfaction of its obligations Wood Wood components must be properly finished on all sides promptly after receipt of unit before installation of unit and prior to ex...

Страница 20: ...Product selection application storage handling modification or waterproofing Movement of surrounding substrates including deflection of the header of more than or any other stresses on product Instal...

Страница 21: ...faces Acts of God falling objects fire accidents external forces or other conditions beyond NanaWall s control Gas fill or retention levels in insulated glass units Field testing of Product Performanc...

Страница 22: ...___________________________________ Project Address if different from above _____________________________________________________________ INSTALLATION Installer Name _______________________________ Ad...

Отзывы: