NANAWALL HSW75 OWNER’S MANUAL
4
Other components include:
• Push/pull handles, other handles or other hardware,
as ordered may not be pre-attached to the panels
and will be in the hardware box or shipped separately.
• The layout drawing of your unit shows the upper
track components consisting of the head track in
the opening, the stacking route(s) and the stacking
bay(s), how they are labeled and how they have to be
connected. The joints for the segments are indicated
and necessary connectors for connecting different
upper track pieces are provided.
• The location of the removable head track (RHT)
portion to insert the rollers on panels is indicated on
the layout drawing.
• The overhead door closer and the conversion box of
single/double action sliding panels are pre-attached
to the top rail, but the locking receiver to be installed
on the side of the head track will be in the hardware
box.
• To prevent the panels from coming off the top track,
stoppers have to be installed at the ends.
• Specified floor sockets, pivot points, pivot boxes and
floor closers
• Crank handle for single/double action sliding panels,
if any.
HANDLING OF COMPONENTS
1.
Upon receipt, inspect the shipment to ensure it is in
good condition.
2. Make sure that all components and hardware, which
might be shipped separately does not get lost.
3. Store in a clean and dry location and protect against
defacement or damage, especially to the edges of
panels.
PREPARATION OF THE OPENING AND SUPPORT
STRUCTURE ABOVE
Make rough opening width at least 1/2
"
wider than the
outside unit frame width and rough opening height
about 3/4
"
taller than the total unit height depending
on how level the support structure above is. See Sheet
2 of the Installation Manual. It is important that the
opening be the correct size.
Product performance that includes operation, depends
on having the gap between the bottom of the panel and
the top of the finish floor be maintained at 7 mm
(1/4
"
)
and also the gap between the top of the panel and the
bottom of the head track to be maintained at a nominal
gap of 25 mm (1
"
). The running carriages can be
adjusted, if needed. The finish floor needs to be
absolutely level across the length of the opening and in
the stacking bay.
The track length and layout have been supplied based
on the configuration and sizes chosen and approved.
Please refer to the layout drawing of your particular
HSW75 project for the correct location of the support
structure (by others) for the support of the head track
at the opening, stacking route and stacking bay. It is
important that the system is properly supported at the
top and at the proper locations.
IMPORTANT:
Any application should take into
consideration the following:
1.
As the HSW system is a top-hung system, it is
essential that a proper substrate with the proper
size and thickness be used for the support structure