background image

NANAWALL HSW75 OWNER’S MANUAL

10 

(43 mm) plus the additional 3/16

"

 (4 mm) for the gap to

 

the wall. 

See Sheet 11 of the Installation Manual.

 This

 

means we have a total of 1 7/8

"

 (47 mm) to the edge of

 

wall. Mark this dimension on the chalk line. If concrete,

 

use a diamond core drill bit with 1 1/4

"

 diameter. Install the

 

pivot point and if necessary, use suitable material to fix it

 

in place. Then install the top pivot axle into the top track.

 

Start inserting the upper flush part into the top track, turn

 

it a 1/4 counter clock wise, push it up higher and turn it

 

another 1/4 clock wise. Before you fix the axle with the

 

2

 

set screws in place, please use a transit/laser or other

 

similar precise measuring equipment to line up the center

 

of the bottom pivot point with the center of the top axle. 

See Sheet 12 of the Installation Manual.

In preparation for the installation of panel #5, take off the 
end cap and top cover on the inside. Screw the 
adjustable bracket onto the threaded bolt of the top axle 
and make sure that the set screw at the side is lose. Now 
you can install panel #5 by lifting the pivot axle, that is 
installed underneath the bottom of the panel, on top of 
the bottom pivot point. Line the top axle with bracket up 
with the shoe that is inserted into the top profile and 
connect both parts with one another. 

See Sheet 13 of the 

Installation Manual.

Before you finally tighten down all screws, make sure that 
all dimensions are set correct, the panel can be opened 
and closed with the right clearance and check if the 
panel is plumb and level. Then fix all screws in place and 
secure the top axle by fixing the set screw from the side. 
Afterwards put the top cover with end cap back on.

Step E3

 

For the offset pivot end panel (non-sliding) with pivot

 

point, the dimension for the center of the pivot axle to the

 

adjacent edge of the wall should be 1/16

"

 (2 mm) and it

 

should be offset to the chalk line by 2 1/16

'

 (52 mm).

 

Please check custom product drawing for swing direction

 

(inside/outside). 

See Sheet 14 and 15 of the Installation 

Manual.

 Mark this point and if concrete, use a diamond

 

core drill bit with 1 1/4

"

 diameter. Install the bottom pivot 

point and if necessary, use suitable material to fix it in 
place. Then install the receiver box for the top axle by 
hanging it off on the side of the top track and fix it slightly 
with the 2 set screws. Use a transit/laser or other similar 
precise measuring equipment to line up the center of the 
bottom pivot point with the center of the top receiver box.

The 2 offset pivot brackets are installed on panel #5 
already. When you start installing this panel, set the 
bottom pivot axle on top of the pivot point and line up the 
top bracket with the receiver box at the top. Take the top 
axle out of the accessory box and connect the bracket 
and the receiver box by sliding it in from underneath. 
Fix the top axle with the set screw from the side. Before 
you finally tighten down all screws, make sure that all 
dimensions are set correct, the panel can be opened and 
closed with the right clearance and check if the panel is 
plumb and level.

Step E4 

For the center pivot end panel (non-sliding) with floor

 

closer, the dimension for the center of the pivot axle of

 

the floor closer to the adjacent wall should be 2 7/16

"

  

(62 mm). 

See Sheet 11 of the Installation Manual.

 

Mark this dimension on the chalk line. Then mark the 
dimensions of the box on the floor and if concrete, cut 
and chisel out the concrete to recess the floor closer into 
the floor. Position the box at the right location in 
relationship to the edge of the wall. 

Make sure that the full underside of the box rests on a 
flush and level surface and fix it 

temporarily

 into place. 

Then install the top pivot axle into the top track. Start 
inserting the upper flush part into the top track, turn it 
a 1/4 counter clock wise, push it up higher and turn it 
another 1/4 clock wise. Before you fix the axle with the 
2 set screws in place, please use a transit/laser or other 
similar precise measuring equipment to line up the center 

Содержание HSW75

Страница 1: ...ingle Track Sliding Frameless System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through NanaWall...

Страница 2: ...s of glass The NanaWall glass thickness for the panels is based on the Glass Association of North America GANA recommended minimum glass thickness for fully tempered Interior butt glazed fixed glass p...

Страница 3: ...E OF A 5 PANEL UNIT Panel 1 sliding panel Panel 2 sliding panel Panel 3 sliding panel Panel 4 sliding panel Panel 5 double action end panel non sliding with pivot box or double action end panel non sl...

Страница 4: ...lean and dry location and protect against defacement or damage especially to the edges of panels PREPARATION OF THE OPENING AND SUPPORT STRUCTURE ABOVE Make rough opening width at least 1 2 wider than...

Страница 5: ...lable please verify the type of sockets for this order If planning to cut into a post tensioned concrete for bottom door closers pivot boxes and sockets a structural engineer and architect has to be c...

Страница 6: ...ews provided See Sheet 4 of the Installation Manual Make sure that the correct angles between segments are maintained and that the transitions between the track segments are perfectly aligned and smoo...

Страница 7: ...FORCED TO ENSURE THAT THE UPPER TRACK IS NOT BOWED Upper track segments must be joined such that they are even tight and aligned perfectly Otherwise the running carriages may wear out prematurely whic...

Страница 8: ...E HAS TO BE SECURED TO THE SOCKET IN THE PIVOT BOX IN THE FLOOR BEFORE THE SINGLE DOUBLE ACTION SLIDING PANEL CAN FUNCTION PROPERLY OTHERWISE IT WILL NOT BE STABLE AND CAN FALL AND HURT SOMEBODY C GAP...

Страница 9: ...hanism is not in the way Make sure the panels are straight and the correct 4 mm gap between panels is maintained Start with the panel furthest away from the parking bay and add blue masking tape under...

Страница 10: ...6 52 mm Please check custom product drawing for swing direction inside outside See Sheet 14 and 15 of the Installation Manual Mark this point and if concrete use a diamond core drill bit with 1 1 4 di...

Страница 11: ...ip to the edge of the wall Make sure that the full underside of the box rests on a flush and level surface and fix it temporarily into place Then install the receiver box for the top axle by hanging i...

Страница 12: ...ed Check if all angles are correct Each leg of the stacking bay track should be equidistant at all points Step F5 Correct any problems before you finish the trimming Do not attach any trimming directl...

Страница 13: ...n edge bolt with hand or foot d Automatic Locking when adjacent panels are pulled together and properly aligned the bolt automatically engages 4 Note that there is a carrier at each upper corner of a...

Страница 14: ...e head track and engages to the top rail Turn about 8 10 revolutions in a clockwise direction until there is a slight resistance 3 Release the Quick Release Lock on the pivot side to disengage the loc...

Страница 15: ...ce Its appearance may be marred by harsh chemicals abuse or neglect Frequency of cleaning depends on exposure and needs For aluminum surfaces generally warm soapy water should be sufficient Stubborn s...

Страница 16: ...licable codes and regulations Glass shall meet the current requirements of ASTM C 1306 Standard Specifications for Flat Glass for quality thickness and dimensional tolerances Tempered float glass shal...

Страница 17: ...soap and fresh water at least every month and more frequently if necessary After washing the surface should be rinsed thoroughly with clean water and allowed to dry For cleaning do not use abrasive h...

Страница 18: ...antial cracking chipping or peeling due to the deterioration of the finish exclusive of mechanical damage 2 chalking in excess of a numerical rating of 8 as per ASTM D 659 or 3 fading or color changes...

Страница 19: ...e of the affected product in full satisfaction of its obligations Wood Wood components must be properly finished on all sides promptly after receipt of unit before installation of unit and prior to ex...

Страница 20: ...Product selection application storage handling modification or waterproofing Movement of surrounding substrates including deflection of the header of more than or any other stresses on product Instal...

Страница 21: ...faces Acts of God falling objects fire accidents external forces or other conditions beyond NanaWall s control Gas fill or retention levels in insulated glass units Field testing of Product Performanc...

Страница 22: ...___________________________________ Project Address if different from above _____________________________________________________________ INSTALLATION Installer Name _______________________________ Ad...

Отзывы: