Page 56
7. INITIALIZATION
Adjustments when Replacing Parts
The following operation must
always be performed after replacing the NAOMI Game
PCB, Joystick Potentiometers or initializing the backup data..
The game will not operate correctly if these adjustments are not made.
1.
Slide the TEST switch ON while pressing and holding the SERVICE switch. The
following screen is displayed.
I/F INITIALIZE
KEEP STICKS CENTRE POSITION
AND PRESS SERVICE SW
GO TO [SWITCH TEST]
............................ (a)
SELECT SW :CHOOSE
ENTER SW : ENTER
2.
Ensure that all joysticks are in their central position, then press the Service button
to initialize the setting details.
3.
Press the Enter button to go to the Switch Test and confirm correct joystick
operation.
Содержание WORLD KICKS
Страница 2: ...Page 2...
Страница 3: ...Page 3 WORLD KICKS...
Страница 17: ...50cm 50cm 50cm 2m50cm 1m 1m 3m PATHWAY SAFETY ZONE Page 17 CDE FGH IF J K 500NN 230 57 7GH 500JJ 2280NN...
Страница 78: ...Page 78 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 16 17 18 19 22 21 20 19 23 9 4 Monitor Cabinet...
Страница 80: ...Page 80 1 2 3 4 5 6 7 9 10 8 11 9 5 Header Assembly...
Страница 85: ......