12.0 Troubleshooting

(continued...)

Common Installation Faults

For optimum performance, this unit must be correctly sized to
match the heat loss requirements of the space it is required to

heat, and the heating system must be correctly designed to
provide adequate flow of hot water to the unit (refer to section
2). If the recommendations in section 2 are not followed,
problems may arise as detailed below.

Heating Mode -

No Fan

Heating Mode

(Heater Model only)

poor heating

performance and/or

unit cycles on

water sensor

Possible Causes

Unit switched off

Temperature set point reached

Unit not switched on at fused spur

Fuse blown at fused spur

Unit isolating valves shut

Water temperature reaching fan

convector below 43°C

(Heater model only)

Problem

Remedy

Low water temperature to unit

Turn up boiler thermostat

Poor water flow

Vent air from heating system

Turn on

Increase temperature set point

Switch on at spur

Replace fuse

Open valves

Check boiler -

Programmer ON

Boiler ON and set to high with central

heating pump running

Note:

Operation of fan convector can be checked by

switching to manual fan setting

Heating Mode

(Heater Model only)

poor heating

performance and/or

unit cycles on

water sensor

Possible Causes

Boiler thermostat set too low

Lack of flow to fan convector -

Pump set on low setting

Isolating valves not fully open

System incorrectly balanced with unit starved of hot water flow

Pipe sizing to unit too small

Problem

Poor heating performance

(Heater Model only)

Unit incorrectly sized for heat loss of room

13.0 Maintenance

Before undertaking any maintenance activity isolate the
electrical supply.

Maintenance should be restricted to occasional removal of dust
and lint around the unit. The outer surface may be wiped over

with warm water and mild detergent taking care to avoid water
entering the grille areas.

If the fan convector is still faulty after checking the above, call your installer or MYSON Service.

1

1

.0

1

2

.0

1

3

.0

For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - [email protected] 0844 556 1818   

Содержание LO-LINE RC 14-10

Страница 1: ...56 service convectors myson co uk Spare parts and technical help on all Convector products are available from Myson Service MYSON Eastern Avenue Team Valley Gateshead Tyne Wear NE11 0PG UK T 0845 402 3434 F 0191 491 7568 sales myson co uk www myson co uk For latest prices and delivery to your door visit MyTub Ltd www mytub co uk info mytub co uk 0844 556 1818 ...

Страница 2: ... Number Please leave this manual with the end user Part Number 1370057 Issue 1 heatingthroughinnovation LO LINE RC LO LINE RC Heater cooler Models 6 4 9 6 14 10 19 15 For latest prices and delivery to your door visit MyTub Ltd www mytub co uk info mytub co uk 0844 556 1818 ...

Страница 3: ... 04 6 0 Fixing 04 7 0 Water Connections 05 8 0 Electrical Connections 06 9 0 Commissioning Procedure 07 10 0 Technical Data 08 11 0 Operating Instructions 09 12 0 Troubleshooting 10 13 0 Maintenance 11 Contents For latest prices and delivery to your door visit MyTub Ltd www mytub co uk info mytub co uk 0844 556 1818 ...

Страница 4: ...should be considered to provide adequate water flow 4 The system water must be above 43 C for heating mode 5 For heat pump applications see Commissioning Procedure 6 This unit is NOT suitable for one pipe systems 7 Optimum performance will require effective balancing of the whole system 8 This unit must not be used to replace a radiator in an existing system unless an adequate flow of water throug...

Страница 5: ...e wall plugs are suitable for the wall type G Remove the backing from the self adhesive washers and place on screws with adhesive side towards the point G Tighten the screws into the wall leaving about 9mm projecting G Press adhesive washers to the wall Remove the outer casing as follows G Remove the 2 screws from the underside of the unit see fig 2 G Lift off the outer case G Fit chassis on to mo...

Страница 6: ...s added to the system as necessary G Open valves fully check pipe connections for leaks and vent the heat exchanger see Commissioning Procedure LO LINE Heater Cooler installations with chilled water will require provision for condensate disposal in accordance with any local regulations A drain tray is fitted for condensate collection within the unit This should be connected to a 15mm drain pipe No...

Страница 7: ...he cable gland provided or through the hole provided at the upper right hand corner of the chassis G Connect live and neutral wires to the power board terminal connections and the earth wire to the chassis earth terminal 8 0 Electrical Connection WARNING This appliance must be earthed The electrical installation must comply with local or national wiring regulations O O L N Motor Power Board Contro...

Страница 8: ... but for systems such as those with heat pumps a lower water set point may be required The set point can be adjusted using the set point switch located on the control board G Isolate electrical supply G Remove outer cover G Change switch position see fig 4 G Refit cover G Switch on electrical supply Displayed Temperature Calibration This function enables calibration of the displayed temperature to...

Страница 9: ...1533 1305 2291 1656 3128 1725 1464 1203 2187 1511 2987 1632 1340 1104 2002 1345 2734 1452 1228 1052 1835 1347 2505 1427 1032 878 1542 1113 2106 1159 877 754 1310 969 1788 1034 710 581 1061 770 1448 957 600 507 896 639 1223 655 499 423 745 535 1018 553 496 397 741 526 1012 654 391 335 585 429 798 454 321 277 480 357 655 383 Boost Medium Low Boost Medium Low Boost Medium Low Boost Medium Low 19 15 1...

Страница 10: ... summer for example or that heating performance can be controlled manually The unit can be controlled using the infra red remote control handset supplied with the unit see fig 5 and also using the control panel on the unit see fig 6 If necessary however the control panel can be locked electronically to prevent tampering once the controls have been set see below The remote control hand set takes 2 ...

Страница 11: ...tton for about 6 seconds until the horizontal bars disappear 10 LO LINE RC LO LINE RC Heater Cooler 12 0 Troubleshooting Once installed this fan convector becomes part of a complete heating system that will generally include a boiler pump other emitters such as radiators and fan convectors and a number of heating controls dependent on system complexity An apparent problem with this unit may be the...

Страница 12: ... spur Replace fuse Open valves Check boiler Programmer ON Boiler ON and set to high with central heating pump running Note Operation of fan convector can be checked by switching to manual fan setting Heating Mode Heater Model only poor heating performance and or unit cycles on water sensor Possible Causes Boiler thermostat set too low Lack of flow to fan convector Pump set on low setting Isolating...

Отзывы: