![Myricom Myrinet-2000 Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/myricom/myrinet-2000/myrinet-2000_manual_1862979020.webp)
© 2001, Myricom, Inc.
-- 20 --
Revision: 27 August 2001
All configurations larger than 16 hosts and up to 128 hosts escape the (page 12) ‘special case’
optimization of the M3-E16 with an M3-SPINE line card, and use all M3-SW16 line cards.
Indeed, the configuration of Myrinet-2000 switch networks for 16 <
N
≤
128, where
N
is the
number of hosts, is particularly simple.
First, count the number of hosts you wish to connect using each Myrinet PHY
(Fiber, Serial, SAN). You’ll need one M3-SW16-8{F|S|M} line card for each 8
hosts of each PHY. Then, pick an enclosure that will accommodate all of these
port line cards, plus as many spare slots as you may expect to add line cards when
you expand the cluster
3
.
Example 1:
You are under contract to build a cluster with 20 hosts within a cabinet, for
which you have decided to use SAN links, and 6 external hosts connected by Fiber links.
You’ll need 3 M3-SW16-8M line cards, and 1 M3-SW16-8F line card, in an enclosure that
will accommodate at least 4 port line cards (M3-E32). The cluster is for a fixed, embedded
application, and will not grow, and rack space is at a premium. So, you order the following
components for the switch network:
Qty
Modular component
1
M3-E32 (enclosure)
1
M3-M monitoring card (highly recommended) or M3-BLANK
3
M3-SW16-8M (port line card with 8 SAN ports)
1
M3-SW16-8F (port line card with 8 Fiber ports)
Example 2:
You plan to build a 64-host cluster that you expect to expand soon to 128 hosts, and
perhaps to an even larger size eventually. Accordingly, you order the following components for
the switch network:
Qty
Modular component
1
M3-E128 (enclosure)
1
M3-M monitoring card (highly recommended) or M3-BLANK
8
M3-SW16-8F (port line card with 8 Fiber ports)
8
M3-BLANK (blank front panels)
Hosts and line cards can then be added incrementally up to 128 hosts.
Scenario 2a:
The management (or sponsor) is so happy with the results from the 64-host and
then the 128-host cluster that they want you to expand it to 256 hosts. Every 128-host switch
component, as well as interfaces and cables, can be re-used effectively in a 256-host
configuration (see the following sections).
3
We’re not trying to promote the sale of empty enclosure slots or of M3-BLANK panels. Myricom sales records
show that
most
Myrinet clusters will be expanded during their lifetime, and often within months of their initial
installation.