
The MyGate Q71B Control Board Installation Manual : Printed 06/11/2012 14:25
19
Have you tried the gate automation’s full open & close cycle for the first time since completion of
the programming?
Did the gate(s) open and close perfectly?
If the gates timing was not as perfect as you would like, please repeat the programming process from step
“a)”. The completion of the programming sequence will replace any previously saved settings.
Have you tried and tested the gates Obstacle Detection after completing the first cycle since
completion of the programming?
If the gates did not respond as quickly as you would of hoped, please repeat the programming process fro,
step “a)” paying particular attention to the position of the RV1 trimmer for the torque setting. Adjust this
trimmer switch to a lower position. The motors may be providing more psuh and pull power than they need
to be for the weight of your gate.
To recap:
The emergency stop link in place
The photocells have been wired to the control board
The motor(s) have been wired to the control board
The remote controls have been programmed the control board
The opening & closing cycles have been programmed
The opening & closing cycle has been tested
The Obstacle detection level / setting has been tested
Your installation is now complete!