When open the packing, please make sure to use the proper tools, wear protective cloth,
gloves, safety helmet
Make sure that the product and parts in box should be complete and identical with the part
list. If not, please contact with the manufacturer in time.
3.4 Disposal of the packaging
The packaging of these machines consists of PVC film and polywood case. The proper
disposal of the packaging is the responsibility of the customer.
3.5 Installation
The machine must only be installed and commissioned by qualified personnel!
All relevant safety regulations must be strictly adhered to!
Packing Condition
The bed frame(31) is put in the bottom in order to convenient for package and
transport, then fixed on the frame by two bolts M12.
Attach the base section (01) and support (03) to left and right post using bolt (02),
washer (06), lock washer (05) and nut (04).
3.4 Installation
The machine must only be installed and commissioned by qualified personnel!
All relevant safety regulations must be strictly adhered to!
Packing conditions
1.
The bed frame (31) is put in the bottom in order to convenient for package and transport, then fixed on the frame by
two bolts M12.
2. Attach the base section (01) and support (03) to left and right post using bolt (02), washer (06), lock washer (05)
and nut (04).
10
Figure 1
Assemble the nylon ring (71) to gauge fitting (51), then put the pressure gauge (50)
and twist tight. Remark: twist as tight as possible, otherwise it will be leak. Attach the
gauge fitting to the suitable upper cross beam and twist nut (52)
Figure 2
Pump assemble: attach the pump assy’ (53) to frame by using washer (15) and bolt
(54) and twist tight.
Hydraulic hose 1 assemble: dismantle the plug from Hydraulic hose 1 (57) then
assemble the o-ring(55), also dismantle the plug from ram assy’(46), connect the
Hydraulic hose 1 (56) to ram assy’(46) and twist tight.
Hydraulic hose 2 assemble: attach the o-ring (55) to gauge fitting (51), then put the
Hydraulic hose 2(57) into the gauge fitting (51) and twist tight, connect the PU pipe
(A-A). Attach the handle (64) to the pump pin by using bolt (65) and twist tight.
Remark: before assemble, open the breather valve first which is on the cylinder (pull
up the breather valve).