9
EXP series
- 2 - INSTALLATION
2.1 MOUNTING
Place the tower over a flat and stable surface to install the tower, discarding its use over rolling platforms
or surfaces which would be able to bear as much its own weight as coupled load. The installation area
must be free of debris, stone, etc. that reduce the firmness of the tower at ground. Moreover the tower
must no be placed near element which can obstruct the vertical folding process like balconies, cornices,
etc. Be aware specially with the proximity of electric cables which the tower could take or crimp them.
Consider that the tower is not electrically isolated, so, it can be load with electricity and to constitute a
serious electric shock risk.
IMPORTANT - In case of wind, even light, avoid to lift screens or equipment with large surfaces.
2.2 LIFTING PROCESS
EXP350 - EXP400 - EXP450
•
Unlock the foot safety pin (A) unscrew the blocking Wheel (B)(see figure 1).
•
Push the sliding front foot support downwards until it locks itself in unfolded position and tighten the
security wheel (B)
•
Unlock rear foot (C), unfold it and lock into position (D).
•
Check the elevator stability thanks to the bubble marker (E).
•
Adjust if required the leg position with the appropriate safety pin location (F) to offset a possible un
irregular floor.
•
Position the load fixing device (R) et secure it with screw.
•
Push the locker forward (J).
•
Position the handle on axle (H) and check the self locking system.
•
During the lifting operation you should hear a regular clicking sound. If you do not hear this sound,
turn the handle several times both ways up and down. If the sound cannot be heard do not use the
elevator and contact your local dealer.
•
The height of load can be checked directly (line between the first and the second section) on the scale-
line (I) integrated to the 2d section. The load can be adjusted to the cm
EXP350T - EXP500T - EXP520T
•
Unlock each leg (N), position it in the corresponding locating hole (O) until it is safely locked (see figure
2).
•
Check the lifter stability with bubble marker (E).
•
Adjust if required the leg position (P) thanks to the handle (H) to correct a possible irregular floor.
•
Check again the lifter stability with the bubble marker (E).
•
And renew the operation until you obtain perfect stability.
•
Position the load fixing device (R) et secure it with screw.
•
Push the locker forward (J).
•
Position the handle on axle (H) and check the self locking system.
•
Turn the handle clockwise to lift the load up to the appropriate level.
•
During the lifting operation you should hear a regular clicking sound. If you do not hear this sound,
turn the handle several times both ways up and down. If the sound cannot be heard do not use the
elevator and contact your local dealer.
•
The height of load can be checked directly (line between the first and the second section) on the scale-
line (I) integrated to the 2d section. The load can be adjusted to the cm
•
Do not lift beyond « stop » signal.
•
Disconnect the handle (H).
Содержание PROTRUSS EXP350
Страница 1: ...MANUALE UTENTE USER MANUAL EXP350 EXP400 EXP450 EXP350T EXP500T EXP520T TELESCOPIC LIFTERS IT EN...
Страница 12: ...EXP series 12 Fig 2 Fig 1...
Страница 15: ......
Страница 26: ...EXP series 10 Fig 2 Fig 1...
Страница 31: ......