31
START-UP DATA LOG
START-UP DATE: _______________________________ SHIP DATE: _____________________________
JOB NAME: _________________________________JOB NUMBER: _____________________________
ADDRESS:_________________________________________________________________
MULTISTACK REPRESENTATIVE: ____________________________________________________
MODEL NUMBER: ____________________________________________________________
MODULE SERIAL NUMBERS
1. ____________________ 7. _______________________
2. ____________________ 8. _______________________
3. ____________________ 9. _______________________
4. ____________________ 10. _______________________
5. ____________________ 11. _______________________
6. ____________________ 12. _______________________
WATER SIDE AND INSTALLATION CHECKLIST CIRCLE CORRECT RESPONSE
1. Chiller mounted on rails and isolators?
YES NO
2. Any visible damage, oil or refrigerant leaks?
YES NO
If yes, detail: ________________________________________
3. All pipe work independently supported from chiller?
YES NO
4. System sensor wells installed:
CHILLED:
IN OUT
CONDENSER:
IN OUT
5. Flow or differential switches installed:
CHILLED: ____ CONDENSER: ____
6. Operation of flow or differential switches with reduction of 50%.
P __________
8. Condenser 3-way by-pass valve?
YES
NO
If yes, Temperature set point: _____°F
9. System strainers installed?
CONDENSER:
YES
NO
EVAPORATOR :
YES
NO
10. Install System sensors and apply thermal paste?
YES NO
ELECTRICAL AND CONTROLS CHECKLIST
1. All electrical connections tight and correct?
YES NO
2. Power wiring sufficient to carry F.L.A.?
YES NO
3. Voltage levels:
PHASES: 1 + 2 _______ 2 + 3 ________ 1 + G _______ 2 + G ________ 3 + G ________
4. Set module board addresses, run communication wire, do factory reset on Master Control?
YES NO
5. Program system variable to site connections, date and time?
YES NO
6. Verify demand for cooling?
YES NO
7. Check temperature and pressure sensors through microprocessor display?
YES NO
8. Check interlock operation: Stop chilled water pump?
YES NO
Stop condenser water pump?
YES NO
9. Provide training to contractor or owner?
YES NO
9. Leave system in full operation?
YES NO
10. Notify contractor of any problems?
YES NO
Start-up Service Technician
Owner or Contractor Acceptance
DESIGN PARAMETERS
1. ECHW
____________________
2. LCHW
____________________
3. CHW GPM ____________________
4. CHW P DROP ____________________
5. ECW
____________________
6. LCW
____________________
7. CW GPM
____________________
8. CW P DROP ____________________