9 of 9
Document Number: 020009017 May 12, 2022
Subject: BIC Tune Up
Verify operation with manager? Step 1 page 2. Note manager concerns:
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
Record firmware and recipe versions at beginning of Tune Up? Step 2 page 2.
UI SW VERSION ____________ SRB SW VERSION __________
LEFT MIXER SW ____________ RIGHT MIXER SW __________
FILE __________________ MENU CONNECT __________
Record “DRINKS SINCE INSTALLATION”? Step 3 page 2.
LEFT MIXER COUNT _________ TOTAL COUNT ____________
RIGHT MIXER COUNT _________
Record “DRINKS SINCE LAST MAINTENANCE DATE” . Step 3 page 2.
LEFT MIXER COUNT _________ TOTAL COUNT ____________
RIGHT MIXER COUNT _________
Replace Blender Grate O-rings? Step 7 page 2.
Pour beverage drain cleaner down the left blend chamber drain, dispense area
drain and the right blend chamber drain? Step 14 page 2.
Replaced the LMS Valves? Step 16 - Step 22 page 4.
Remove the ice bin. Step 24 & Step 25 page 4.
Replaced the shaver blade? Step 28 page 4.
Remove the ice shaver gasket from the ice bin and/or the top of the dispense area
cover? Clean the surface areas? Step 31 page 4.
Replace the shaver gasket? Step 33 page 4.
Wash, rinse and sanitize the ice bin? Step 30 page 4.
Pour beverage drain cleaner down the ice condensate bowl drain opening? Step 27
page 4.
Replaced the shaver belt? Step 39 & 40 on page 5.
Replace the CO2 and Water supply line O-rings? Step 43 & 44 on page 6.
Clean the condenser coil? Step 45 page 6.
Clean the condensate pan? Step 46 page 6.
Clean the condensate drain line? Step 47 page 6.
Pour hot water down drain openings of the ice bin, right blend chamber, dispense
area, and left blend chamber? Step 49 page 6.
Work the drains by hand squeezing out any buildup? Step 51 - 52 on page 6.
Connect water, CO2, drain, and power cord? Step 55 page 6.
Rear drain line connected correctly to store drain?
YES
NO
Set the water pressure regulator to 35 psi dynamic? Step 56 page 6.
Set the CO2 pressure regulator to 35 psi dynamic? Step 56 page 6.
Re-install all exterior panels? Step 58 page 7.
Retrieve product from the walk in cooler and return to the BIC refrigerated cabinet?
Step 60 page 7.
Verify and assign flavor slot assignments in accordance to McDonald’s Corporate?
Step 60 page 7.
Complete the Zone 2 cleaning? Step 59 page 7.
Confirm “CONFIGURE YOGURT SMALL DISPENSE” to zero (0). Step 63 page 7.
Confirm “PLUNGE SPEED” is set at 15. Step 65 page 8
Confirm “CUP OFFSET” is set at 2.0. Step 65 page 8
Perform calibration for all flavors, water, and ice? Step 66 page 8.
Reset “LAST MAINTENANCE DATE”? Step B page 8.
Make samples of drinks with manager present. Step 69 page 8.
Fax or email completed Tune Up Checklist to the RISE Group at 920-683-
7592 or [email protected]
Submit claim for service work through Multiplex Claims Processing System.
Tune Up Checklist MUST be attached to claim or claim will be DENIED.
Technician Signature:
Date:
Technician Printed Name:
Time In:
Service Agent:
Time Out:
By signing this you agree that the Preventive Maintenance has been done completely and is satisfactory.
Store Manager/Operator Signature:
Date:
Store Manager/Operator Printed Name:
Time:
BIC TUNE UP CHECKLIST
Store #
Store Address
Store Phone #
Serial Number
Model