hydro-guard

® 

 

remote Pressure Monitoring System

operating Instructions

8

MEASUREMENTS PAGE: From the Measurements page, the viewer can select a time frame to be viewed for the all 

units or select units. For example, by selecting “Month” all the data collected by an identified unit in the past month is 

shown on an operational curve of Pressure (psi) over that period of time. Measurements recorded today; over the past 

two days; over the past week; or even those recorded over the past two years can be viewed on the Measurements page. 

Data trend mapping includes minimum, maximum and averages for every hour, as well as transient state reports. 

DATA LOG AND INFORMATION DOWNLOADS: Pressure measurements can be reviewed in log form. From the 

Measurements page select the View Measurements tab (see highlighted area). A running log of measurements can 

be viewed; notes related to the log entry can be added; and all information can be downloaded as a CSV or XLS file 

for system management recordkeeping.

9

MIN / MAx / AVG

Transient

Readings

Содержание Hydro-guard

Страница 1: ...res involving the Unit 2 Be sure the corporation valve or other isolation valve is closed prior to installation or removal of the pressure sensor 3 Always use all necessary safety equipment and follow...

Страница 2: ...ommunication signal is not impeded into account and open the Device which is to be mapped Select Edit and enter longitude and latitude coordinates in the appropriate fields Shipping The Remote Pressur...

Страница 3: ...prevent damage to the RTU Once asphalt work is completed replace iron lid with the RTU Be sure the sensor tip is exposed to line pressure prior to connecting the sensor cable to the RTU 8 Once the co...

Страница 4: ...on the top navigation bar into the RTU and the pressure sensor is exposed to line pressure The first reading may take up to 24 hours to be transmitted to the website The Device will reveal system pre...

Страница 5: ...edit settings for a specific monitored location click the associated icon on the map Registration page This page will allow the client administrator to enter a password select how the system shall se...

Страница 6: ...ce SETTINGS web page and locate the calendar application at the lower section of the management screen Using the blue PLUS button open the drop down navigation Select CONNECT to select the date s and...

Страница 7: ...ular site Latitude and Longitude GPS location of the unit is automatically determined when the Device is installed In the event the GPS signal is obstructed and unable to locate the Device the install...

Страница 8: ...ast two days over the past week or even those recorded over the past two years can be viewed on the Measurements page Data trend mapping includes minimum maximum and averages for every hour as well as...

Страница 9: ...second generation product to schedule data transfers from each RTU to a designated storage folder located on their computer or network To begin start Launch of software application and log into the u...

Страница 10: ...e up to 24 hours for data and location to appear after installation Description Pressure Warning Low Critical Low Warning High Critical High Test_Device 3 Sensor Serial 1419200209 56 1 1 0 2 0 175 0 1...

Страница 11: ...itoring System features an analytic function that allows an operator to compare measurements against one another for enhanced distribution system management hydro guard Remote Pressure Monitoring Syst...

Страница 12: ...so that the antenna wires are free 3 Disconnect battery lead connectors and reconnect new battery pack using the mated connectors on the replacement battery Ensure wires are securely connected before...

Страница 13: ...f cellular service and a 5 year battery Additional years of cellular service and a 5 year replacement battery may be purchased from Mueller Company Additional costs may include installation of the uni...

Страница 14: ...be used ID Description 1 3 8 x 13 8 shoulder x 5 16 5 18 screw SS 2 Antenna Composite Lid 3 RTU Remote Telemetry Unit w Lithium Batteries 4 AJBV 4D Ductile Iron Adjustable Top 12 L 5 Mueller Composite...

Страница 15: ...hydro guard Remote Pressure Monitoring System Notes 15...

Страница 16: ...Co LLC its affiliates or other third parties Products marked with a section symbol are subject to patents or patent applications For details visit www mwppat com These products are intended for use in...

Отзывы: