background image

hydro-guard

® 

 

remote Pressure Monitoring System

operating Instructions

9

1. Located the settings icon (

Y

) and 

select;
2.   Click on the Hydroguard App 

1.0.0 link to download the application 

file to a dedicated computer(s);
3. Once the application is loaded on 

the dedicated computer(s) click on 

the file to unpack the zipped file;
4. Extract the software application’s 

management files by clicking on 

the Hydroguard App 1.0.0.exe 

application;  

AUTOMATED DATA TRANSFER 

AND LOGGING: The released 

Hydro-Guard App 1.0.0 software 

for the Hydro-Guard Pressure 

Monitoring System allows operators 

of the second generation product 

to schedule data transfers from 

each RTU to a designated storage 

folder located on their computer or 

network. To begin, start Launch of 

software application and log into the 

utility’s MIWT.NET account. Follow 

these steps:

5. Click on the ExTRACT ALL 

button to open file location 

preference screen. 
This link will allow for the preferred 

folder location to be selected—

where the Hydro-Guard Pressure 

Monitoring spreadsheets will be 

saved;
6. Select the preferred location for 

where data should be stored;
7. Open folder to view saved data 

log spreadsheets.

software applIcatIon upGrade

ENHANCED TREND MAPPING: View MINIMUM, MAXIMUM and AVERAGE pressure readings for every hour on 

an enhanced graphical trend map at miwt.net.

NOTE: 1 & 4 = Maximum; 2 & 5 = Average; 3 & 6 = Minimum.

Содержание Hydro-guard

Страница 1: ...res involving the Unit 2 Be sure the corporation valve or other isolation valve is closed prior to installation or removal of the pressure sensor 3 Always use all necessary safety equipment and follow...

Страница 2: ...ommunication signal is not impeded into account and open the Device which is to be mapped Select Edit and enter longitude and latitude coordinates in the appropriate fields Shipping The Remote Pressur...

Страница 3: ...prevent damage to the RTU Once asphalt work is completed replace iron lid with the RTU Be sure the sensor tip is exposed to line pressure prior to connecting the sensor cable to the RTU 8 Once the co...

Страница 4: ...on the top navigation bar into the RTU and the pressure sensor is exposed to line pressure The first reading may take up to 24 hours to be transmitted to the website The Device will reveal system pre...

Страница 5: ...edit settings for a specific monitored location click the associated icon on the map Registration page This page will allow the client administrator to enter a password select how the system shall se...

Страница 6: ...ce SETTINGS web page and locate the calendar application at the lower section of the management screen Using the blue PLUS button open the drop down navigation Select CONNECT to select the date s and...

Страница 7: ...ular site Latitude and Longitude GPS location of the unit is automatically determined when the Device is installed In the event the GPS signal is obstructed and unable to locate the Device the install...

Страница 8: ...ast two days over the past week or even those recorded over the past two years can be viewed on the Measurements page Data trend mapping includes minimum maximum and averages for every hour as well as...

Страница 9: ...second generation product to schedule data transfers from each RTU to a designated storage folder located on their computer or network To begin start Launch of software application and log into the u...

Страница 10: ...e up to 24 hours for data and location to appear after installation Description Pressure Warning Low Critical Low Warning High Critical High Test_Device 3 Sensor Serial 1419200209 56 1 1 0 2 0 175 0 1...

Страница 11: ...itoring System features an analytic function that allows an operator to compare measurements against one another for enhanced distribution system management hydro guard Remote Pressure Monitoring Syst...

Страница 12: ...so that the antenna wires are free 3 Disconnect battery lead connectors and reconnect new battery pack using the mated connectors on the replacement battery Ensure wires are securely connected before...

Страница 13: ...f cellular service and a 5 year battery Additional years of cellular service and a 5 year replacement battery may be purchased from Mueller Company Additional costs may include installation of the uni...

Страница 14: ...be used ID Description 1 3 8 x 13 8 shoulder x 5 16 5 18 screw SS 2 Antenna Composite Lid 3 RTU Remote Telemetry Unit w Lithium Batteries 4 AJBV 4D Ductile Iron Adjustable Top 12 L 5 Mueller Composite...

Страница 15: ...hydro guard Remote Pressure Monitoring System Notes 15...

Страница 16: ...Co LLC its affiliates or other third parties Products marked with a section symbol are subject to patents or patent applications For details visit www mwppat com These products are intended for use in...

Отзывы: