hydro-guard

® 

 

remote Pressure Monitoring System

Installation and Site Evaluation

2

GPS Location Considerations

Each Device contains a cellular 

modem and GPS locator. Some 

obstacles can interfere with the 

signals required for each of these 

to operate properly. Confirmation 

of cellular signal can be obtained 

with a standard cell phone. If GPS 

is unavailable, the location of the 

Device can be entered manually 

into the software. Address or 

GPS coordinates should be noted 

upon installation. To obtain GPS 

coordinates (longitude and latitude 

coordinates), it is recommended that

you utilize a GPS location APP or 

website. Enter the nearest physical 

street address to the site where the 

Device will be located into a GPS 

coordinate APP or website to obtain 

the GPS coordinates. Upon obtaining 

the information, enter the longitude 

and latitude coordinates into the 

Device Management website. Log 

Each Remote Pressure Monitoring 

System, consists of an RTU and 

Sensor, (here-by known as Device). 

Prior to the installation of the Device

strategic installation points should be 

identified. Confirmation of a cellular 

signal (Verizon or AT&T) is available 

at the identified site. Contact Mueller 

Co. for additional support if required.
When installing the Remote Pres-

sure Monitoring System with a valve 

box into the distribution network, 

identify the OD and type of pipe as 

well as the depth requirement prior 

to ordering. Mueller Co. can assist 

in verifying that the proper saddle 

and valve box can be supplied.

The Remote Pressure Monitoring 

System lid-mounted antenna shall 

be installed no more than six (6) 

inches below-grade to ensure the 

cellular communication signal is not 

impeded.

into account and open the Device 

which is to be mapped. Select “Edit” 

and enter longitude and latitude 

coordinates in the appropriate fields.

Shipping

 

The Remote Pressure Monitoring 

System is powered by a series 

of lithium batteries. Specific and 

approved shipping procedures must 

be observed. The Remote Pressure 

Monitoring System may be shipped 

with or without a valve box and 

ancillary items depending on the

customer’s desired installation. In 

the event of the unit being returned 

for service, contact Mueller Co. 

Customer Service for approved 

shipping and handling information.
NOTE: The RTU can only be 

shipped via ground transportation 

and must be properly labeled 

to identify presence of lithium 

batteries. Contact Mueller Co. at 

877.864.8500 before shipping.

General

Installation in a Valve Box

1. Remove the Remote Pressure 

Monitor from its packaging and 

inspect for possible damage during 

shipping.
2. Once service saddle installation 

is complete, install guide plate 

(P/N: 147506P) over the service 

saddle and apply suitable sealant 

or joint tape to the inlet side of the 

corporation valve before installing 

into the saddle. Thread the 

corporation valve into the service 

saddle as shown (see page 3). The 

guide plate will center the valve box 

bell end over the service saddle and 

corporation valve.
NOTE: Before drilling, ensure 

guide plate is in between the 

service saddle and corporation 

valve (see page 3).

InstallatIon 

Mode

 Normal

      Request maintenance mode

Status

 

Critical High

Latitude

 35.0757516666667

Longitude

 -85.1868716666666

Uploads per Day

 0

ICCID

 

8901 1704 2580 2049 4799

3. Perform the drilling operation 

adhering to the following operating 

instructions for the particular Mueller 

Co. Drilling Machine being utilized:
• D-5/E-5: Form 9335

• Mega-Cut: Form 12092

• Tru-Cut: Form 11941

• PL-2: Form 10292

Содержание Hydro-guard

Страница 1: ...res involving the Unit 2 Be sure the corporation valve or other isolation valve is closed prior to installation or removal of the pressure sensor 3 Always use all necessary safety equipment and follow...

Страница 2: ...ommunication signal is not impeded into account and open the Device which is to be mapped Select Edit and enter longitude and latitude coordinates in the appropriate fields Shipping The Remote Pressur...

Страница 3: ...prevent damage to the RTU Once asphalt work is completed replace iron lid with the RTU Be sure the sensor tip is exposed to line pressure prior to connecting the sensor cable to the RTU 8 Once the co...

Страница 4: ...on the top navigation bar into the RTU and the pressure sensor is exposed to line pressure The first reading may take up to 24 hours to be transmitted to the website The Device will reveal system pre...

Страница 5: ...edit settings for a specific monitored location click the associated icon on the map Registration page This page will allow the client administrator to enter a password select how the system shall se...

Страница 6: ...ce SETTINGS web page and locate the calendar application at the lower section of the management screen Using the blue PLUS button open the drop down navigation Select CONNECT to select the date s and...

Страница 7: ...ular site Latitude and Longitude GPS location of the unit is automatically determined when the Device is installed In the event the GPS signal is obstructed and unable to locate the Device the install...

Страница 8: ...ast two days over the past week or even those recorded over the past two years can be viewed on the Measurements page Data trend mapping includes minimum maximum and averages for every hour as well as...

Страница 9: ...second generation product to schedule data transfers from each RTU to a designated storage folder located on their computer or network To begin start Launch of software application and log into the u...

Страница 10: ...e up to 24 hours for data and location to appear after installation Description Pressure Warning Low Critical Low Warning High Critical High Test_Device 3 Sensor Serial 1419200209 56 1 1 0 2 0 175 0 1...

Страница 11: ...itoring System features an analytic function that allows an operator to compare measurements against one another for enhanced distribution system management hydro guard Remote Pressure Monitoring Syst...

Страница 12: ...so that the antenna wires are free 3 Disconnect battery lead connectors and reconnect new battery pack using the mated connectors on the replacement battery Ensure wires are securely connected before...

Страница 13: ...f cellular service and a 5 year battery Additional years of cellular service and a 5 year replacement battery may be purchased from Mueller Company Additional costs may include installation of the uni...

Страница 14: ...be used ID Description 1 3 8 x 13 8 shoulder x 5 16 5 18 screw SS 2 Antenna Composite Lid 3 RTU Remote Telemetry Unit w Lithium Batteries 4 AJBV 4D Ductile Iron Adjustable Top 12 L 5 Mueller Composite...

Страница 15: ...hydro guard Remote Pressure Monitoring System Notes 15...

Страница 16: ...Co LLC its affiliates or other third parties Products marked with a section symbol are subject to patents or patent applications For details visit www mwppat com These products are intended for use in...