KIROVETS K-744R1, K-744R2, K-744R3, K-744R4 tractors
77
Before operation of the tractor it is necessary to reinstall the mounted implement parts (Fig. 21,
22, 23) and light signal equipment removed earlier.
Fig. 21 Installation of the hinge pivot of
the upper link
1
– hinge pivot; 2 – tightening screw;
3
– central track rod pipe
Fig. 22 Installation of hydraulic hook
Upon completion of preparatory works, perform maintenance at the tractor preparation for
operating running-in.
5.1.1 Adjustment of lower links
The adjustment of the lower links (Fig.23) shall be performed in the following sequence:
50 mm (min)
Screw
Retainer
Pin
Pin
Brace rod
Screw
Pin
Содержание K-744R1
Страница 2: ...MTZ KIROVETS tractors K 744R1 K 744R2 K 744R3 K 744R4 2...
Страница 107: ...KIROVETS K 744R1 K 744R2 K 744R3 K 744R4 tractors 107 Driving shaft friction clutch I...
Страница 109: ...KIROVETS K 744R1 K 744R2 K 744R3 K 744R4 tractors 109 Driving shaft friction clutches II and III...
Страница 111: ...KIROVETS K 744R1 K 744R2 K 744R3 K 744R4 tractors 111 Driving shaft friction clutch IV...