Installing exhaust pipe
u
Install exhaust pipe bellows (1) with
clamp (2) and sealing ring (3) on turbine
housing.
Installing exhaust pipe insulation
u
Install insulation (2) on exhaust pipe and
secure with clamps (1).
Installing heat shield
132 | Task Description | MS150096/01E 2012-08
TIM-ID: 0000026820 - 002