11
to
the
Main
Body
,
facing
backwards
as
shown
in
the
diagram.
4)
Assemble
the
ndercarriage
from
the
legs
E406
and
skids
E007.
5)
Fix
the
undercarriage
legs
and
skids
with
CA
glue.
6)
Assemble
and
glue
the
Frame
Base
E402
and
the
Frame
Support
E403.
7)
Glue
the
finished
frame
with
the
support
into
the
rear
part
of
the
Main
Frame
E401.
8)
Assembly
the
body
and
the
undercarriage,
using
bolts
E055
an
d
nuts
E056.
9)
Using
bolts
E405
and
nuts
E056
attach
the
Link
Balls
E404
to
the
Frame
Base
E402,
as
shown
on
the
picture.
2
–
T
ail
Rotor
Parts
List:
E016
–
T
ail
Boom
x
1
E417
–
T
ail
Drive
Shaft
x
1
E425
–
T
ail
Gearbox
x
1
E026
–
Bell
Crank
x
1
E027
–
Plastic
Retainer
x
1
E028
–
Tail
Gear
x
2
E032
–
Blade
Grip
x
2
E055
–
Cap
Head
Bolt
M2x8
x
1
E033
–
Pin
1x4
x
2
E034
–
Cap
Head
Bolt
M2
x
5
x
2
E036
–
Tail
Blades
x
2
E431
–
T
ail
Shaft&Hub
x
1
E038
–
Plastic
Spacer
x
1
E058
–
Bolt
M2
x
8
x
2
E091
–
Slider
Cage
CP
x
1
E118
–
Pinion
Gear
10
teeth
x
1
E129
–
T
ail
Slider
Horn
x
1
E250
–
Tail
Slider
Bushing
x
1
L0261
–
Bearing
2x6x2.5F
flanged
x
2
L0265
–Bearing
2
x
6
x
2
x
2
L0361
–
Bearing
3
x
6
x
2.5F
flanged
x
2
L0360
–
Bearing
3
x
6
x
2x
2
E056
-
Nut
M2
x
1
Follow
the
pictures
for
Step
2.
1)
Press
the
Pinion
Gear
E118
onto
the
Shaft
E417.
2)
Slide
the
flanged
Ball
Bearing
L0261
on
to
the
Pinion
Gear
.
NOTE:
The
flange
should
face
to-
wards
the
end
of
the
Shaft.
Slide
two
Ball
Races
L0265
onto
the
T
ail
Drive
Shaft,
distribute
evenly
on
the
shaft.
Glue
in
place
ensuring
no
glue
gets
into
the
Ball
Race.
3)
Insert
the
T
ail
Drive
assembly
into
the
T
ail
Boom
E416.
4)
Insert
the
T
ail
Boom
into
the
Tail
Drive
Gearbox
E425
–
DO
NOT
GLUE
OR
FIX
!
5)
Install
the
Ball
Race
L0261
and
the
Ball
Races
L0361
into
th
eir
position
in
the
T
ail
Drive
Gear-
box.
6)
Slide
the
L0361
Ball
Race
onto
the
Pinion
Gear
E028
and
fir
mly
press
the
assembly
onto
the
end
of
the
Tail
Drive
Shaft.
The
L0361
Ball
Race
flange
must
li
ne
up
with
the
end
of
the
T
ail
Boom.
Check
for
free
rotation
of
the
moving
parts,
the
Drive
Sh
aft
must
rotate
freely
.
If
needed,
adjust
the
space
between
the
Tail
Gear
and
the
Bearing
L0261.
7)
Insert
the
Bearings
L0360
into
the
Slider
Cage
E091.
8)
Slide
the
Tail
Slider
Bushing
E250
into
the
Bearings
from
th
e
side
of
the
Horn
Pin
on
the
Gear-
box.
9)
Screw
the
Tail
Slider
Horn
E129
onto
the
Bushing
E250.
The
B
earings
must
move
freely
,
but
without
play
.
NOTE:
The
T
ail
Slider
Horn
must
be
perpendicular
to
the
Bushing!
1
0
)
Slide
the
completed
Slider
assembly
onto
the
Tail
Rotor
Shaf
t.
It
must
move
freely
.
11)
Insert
the
T
ail
Gear
E028
into
the
Bearing
L0361
and
place
the
Plasic
spacer
E038
into
it’
s
position.
12)
Press
the
tail
rotor
shaft
with
the
slider
assembly
into
th
e
gearbox.
The
shaft
rim
must
line
up
with
the
bearing
outer
surface.
13)
Adjust
the
assembled
Tail
Gearbox/Gears
so
the
assembly
rot
ates
freely
without
excessive
gear
play
or
backlash.
Fix
the
Tail
Gear
box
in
place
using
Screw
E0
55
and
Nut
E056.
1
4
)
Insert
the
Horn
E026
onto
the
Pin
on
the
Gearbox
and
onto
th
e
T
ail
Slider
Pin.
Move
the
Horn
a
couple
of
times
to
free
the
joints.
Everything
must
move
freely
.
Fix
the
Horn
onto
the
Pin
using
Silicone
Retainer
E027.
Glue
the
Retainer
very
caref
ully
to
the
Pin,
avoiding
the
glue
spreading
into
the
Horn
opening!
1
5
)
Lubricare
the
holes
in
the
tail
rotor
hub
-
use
grease,
not
oil!
Insert
the
Bolts
M2x8
into
the
hub.
1
6
)
Screw
the
Blade
Grips
E032
onto
the
Bolts
as
far
as
possible
,
then
turn
them
back
into
the
14
10)
Install
the
Motor
into
the
Main
Frame
using
bolts
E41
1.
T
ig
hten
these
bolts
carefully
,
to
avoid
damage
to
the
motor
mounts.
NOTE:
Before
tightening
the
bolts
adjust
the
Main
Gear
and
Motor
Pinion
mesh.
11)
Glue
the
T
ail
S
ervo
Holder
P
late
E024
onto
the
T
ail
Boom,
approx.
8-10
mm
from
the
Main
Frame,
It‘s
edge
parallel
to
the
T
ail
Boom.
1
2
)
CA
the
T
ail
Fin
E443
to
the
T
ail
Boom.
1
3
)
CA
the
Ball
Links
E421
to
the
Ta
il
Support
Rods
E
449.
14)
Click-on
the
ball
links
onto
the
link
balls
E404
in
the
rea
r
part
of
the
main
frame
assembly
.
Slide
the
V
ertical
Fin
Holder
E419
onto
the
Support
Rods,
check
the
overall
symmetry
and
CA
the
E419
to
the
T
ail
Boom.
15)
CA
the
Horizontal
Fin
E444
to
its
holder
E419,
watch
for
sy
mmetry
.
16)
Complete
the
tail
pushrod
E422
-
CA
one
of
the
servo
links
E420
to
the
rod,
leave
the
other
free
for
future
adjustment
during
the
RC
setup.
7
–
RC
Installation
Follow
the
pictures
for
Step
7.
1)
Fix
the
Tail
Rotor
Servo
to
the
plate
E024
using
double–side
d
adhesive
tape,
so
that
the
Servo
Horn
is
approx.
8
mm
below
the
T
ail
Boom.
The
servo
horn
points
under
the
tail
boom.
2)
Mount
the
assembled
T
ail
Rotor
Pushrod
with
the
fixed
Servo
Link
to
the
T
ail
Pitch
Horn,
and
the
other
(non-glued)
link
to
the
servo
horn.
Follow
the
advice
of
the
gyro
manufacturer
.
For
MS
gyroscopes,
the
link
distance
from
the
horn
axis
of
rotation
is
8-10
mm.
3)
Complete
the
Cyclic
Control
Rods,
using
E021,
E020
and
E058.
The
length
of
the
Rods
will
depend
on
the
servos
used.
4)
Using
CA
glue,
fix
the
Servo
Holder
E407
for
the
Swashplate
control
servos,
and
the
Canopy
Support
E414.
Canopy
Support
is
placed
in
the
slot
on
the
lower
servo
holder
side,
and
is
symmetric
(on
both
ends
equally
long).
5)
Fix
the
servos
to
the
Servo
Holder
E407
using
quality
Double
-Sided
self
adhesive
tape.
Try
to
position
the
servos
so
the
servo
links
are
as
perpendicular
as
possible
to
the
swasplate.
Do
not
fix
the
front
servo
at
this
point
-
the
servo
will
be
fixed
after
the
RC
equipment
is
set
up!
6)
There
are
several
different
ways
to
attach
the
servos
to
the
Frame.
The
system
described
here
is
standard
for
three-point
control
in
the
lengthwise
model
axis,
where
two
servos
control
the
roll
and
all
three
servos
control
the
Pitch
–
This
system
is
normall
y
called
HR3
or
SR3.
All
Rotor
Head
control
servos
MUST
be
of
the
same
type
as
equal
servo
spe
ed
and
deflection
range
is
crucial
for
proper
control.
7)
Using
Double
Sided
T
ape
fix
the
receiver
to
the
Main
Frame.
8)
Install
the
Piezo
gyro
using
the
Double
Sided
T
ape
provided
with
the
gyro.
Follow
the
gyro
instructions.
9)
Fix
the
speed
controller
using
double-sided
tape
to
the
fron
t
part
of
the
Frame
Base
E402.
10)
Because
of
security
reasons,
connect
the
motor
to
the
contr
oller
AFTER
the
RC
equipment
setup.
11)
After
setting
up
the
RC
equipment
(see
section
SETUP
and
AD
JUSTMENT),
centre
the
servos
and
install
the
servo
horns.
In
neutral
servo
positions
the
horns
must
be
horizontal.
Fix
the
horns
with
the
screws
supplied
with
the
servos.
12)
Adjust
the
length
of
the
Connecting
Rods
so
that
the
Swashp
late
is
perpendicular
in
all
directions
to
the
Main
Shaft
when
the
servos
are
in
their
neutr
al
position.
Also
the
Blades
pitch
angle
should
be
at
0°
if
servos
are
in
neutral
positions.
After
adjusting
the
lengths
install
the
Connecting
Rods.
The
distance
of
the
Connecting
Rod
joint
on
th
e
servo
horn
should
be
8
–
10
mm
from
the
horn
bolt
axis.
A
TTENTION
–
this
distance
must
be
equal
on
all
thr
ee
servos.
8
–
Canopy
assembly
E460
-
Canopy
x
1
E461
-
Sticker
set
Hornet
II
x
1
1)
Trim
the
Canopy
halves
to
the
outside
lines
and
assemble
the
tw
o
halves
correctly
using
CA
glue.
Y
ou
can
help
yourself
fixing
the
halves
from
outside
usin
g
pieces
of
self
adhesive
tape.
Paint
the
canopy
with
Lexan
paint
on
the
outside
or,
if
preferr
ed
from
the
inside
before
assem-
bling.