Water Purification System Instruction Manual
3 / 11
Specific installation steps are as follows:
(1). Connect to tap water-1st step:
Shut off the chief switch of tap water, dismantle the tap, connect the water source with
3-direction-links
in the accessories, and then connect the tap with
3-direction-links
, connect
another direction of
3-direction-links
with
plastic ball valve
. At last, open the chief switch of tap
water.
(2). Connect to tap water-2nd step:
Use
1/4” PE tube
with a suitable length. One side connects with the
plastic ball valve
, and the other
connects with the interface with
blue label
marked
“To inlet water”
at the back of machine.
(3). Connect to RO drain:
Use
1/4” PE tube
with a suitable length. One side connects with the interface with
black label
marked
“To drain”
at the back of machine, and the other side is directed to
gutter.
(Do not jam)
(4). Connect to UF drain:
Use
1/
4” PE tube
with a suitable length. One side connects with the interface with
green label
marked
“To UF drain”
at the back of machine, and the other side, through
“UF drain valve”
, is
directed to
gutter.
Attention:
The
“UF drain valve” is shut on normal condition, except for flushing UF membrane.
(5). Connect to water tank:
Install the
plastic ball valve
on the
pressure tank
. Use
1/4” PE tube
with a suitable length. One
side connects with the interface with
yellow label
marked
“To water tank”
at the back of machine,
and the other connects with the
plastic ball valve
.
Thus the installation is OK.