background image

19

INSTALLING THE REMOTE TEMPERATURE PROBE 

for eTEMPO/Plus

®

Controls 

(PN: MSTS)

The Remote Temperature Probe (MSTS-60) is 

for use with eTEMPO/PLUS Controls only. Do not use any 
other controls. Do not use any other temperature probe with the 
eTEMPO/PLUS controls. Noncompatible products may result in an 
inoperative control and a hazardous condition.

Install the eTEMPO/PLUS controls according 

to the installation instructions on pages 15-17. Failure to do so
may result in an inoperative control and a hazardous condition.

1.

The Remote Temperature Probe must be installed inside the

steam room and must be:

a. On a vertical surface
b. 4-5 feet above the floor

c. Locate the MSTS Temperature Sensor in a 

location representative of the desired 
steambathing temperatures. Do not
locate the MSTS above or near the
steam head or direct steam emissions.

The probe has an integral 60' cable. Insure
that the probe and/or steam generator are
located accordingly. 

2.

Drill a 5/16 inch diameter hole in the wall

as shown in Diagram 1. Do not oversize or
undersize the hole. Clean area thoroughly.

3.

Remove the knock-out from the steam gen-

erator jacket as shown in Diagram 2.

4. 

Insert the remote temperature probe cable

through the knock-out and connect to the
connector on the steam generator printed
circuit board marked EXT TEMP as shown
in Diagram 2.

NOTE: FOR ILLUSTRATIVE 

PURPOSES ONLY.

DRAWING NOT TO SCALE

!

C A U T I O N

!

C A U T I O N

Mr.Steam Steam Generator

(shown with cover removed and NOT installed)

Temperature

Probe Cable

(60 feet)

Temperature

Probe Connection

Knock-Out

Temperature

Sensor Probe

DIAGRAM 1

DIAGRAM 2

mr

.

steam

®

club therapy

®

eTempo Controls

______________________________________________________________________________

Содержание CT12E

Страница 1: ...mr steam club therapy Club Therapy Steambath Generator Systems Installation Operation Maintenance Manual Models CT 6E CT 9E CT 12E...

Страница 2: ...mbing Water Supply Drain Steam Outlet Safety Valve Drain Pan AromaSteam 5 Steam Head Installation 6 Generator Dimensions 7 Electrical Specifications Field Power Wiring 8 Wiring Diagrams 9 10 Initial S...

Страница 3: ...h the steam head and avoid the steam near the steam head C Prolonged use of the steam system can raise excessively the internal human body temperature and impair the body s ability to regulate its int...

Страница 4: ...isclaims responsibility for the sizing of a model selected IMPORTANT For steam rooms constructed of acrylic or synthetic materials select next lower rated CT model WARNING In considering a purchase of...

Страница 5: ...dripping of condensate If acrylic fiberglass or other non heat resistant materials are used as part of the steam room enclosure Consult with the material manufac ture and see pg 6 Steamhead for additi...

Страница 6: ...with bathers NOTE FOR ILLUSTRATIVE PURPOSES ONLY Consult with qualified designer architect or contractor for steam room construction details Provide unions as required to facilitate installation and d...

Страница 7: ...AutoFlush valve automatically will open and drain the generator Steam Outlet 1 2 NPT 1 Do not install any valve in steam line Flow of steam must be unobstructed 2 Use 1 2 inch brass pipe or copper tub...

Страница 8: ...rary nipple 6 or longer in the drop ear fitting to locate the steamhead after the wall is finished STEP 4 After the wall has been finished mark on the nipple where the surface of the wall is Remove th...

Страница 9: ...nal AutoFlush 2 All units in inches MM Water Inlet Control Accessory Connections Steam Outlet Safety Valve AutoFlush Manual Drain Valve IMPORTANT NOTE Provide a minimum of 12 inches at both ends and t...

Страница 10: ...bly sized equipment grounding wire to ground termi nal provided 4 Install a separate circuit breaker between supply and unit Provide a power supply disconnect within sight of the steam generator or on...

Страница 11: ...ARD CONTACTOR HEATING ELEMENT TO PROBE AUTOFLUSH CT STEAMSTOP ET PLUS CONTROL TRANSFORMER POWER INPUT L1 L2 FUSES GROUND WATER FEED SOLENOID VALVE EXPRESS STEAM THERMOSTAT HEATER FACTORY WIRING FIELD...

Страница 12: ...LUS CT STEAM STOP and MSTS WARNING CAUTION mr steam clubtherapy Installation Operation Maintenance Manual ______________________________________________________________________________ FACTORY WIRING...

Страница 13: ...into a steam enclosure or any location where accidental contact with drain water may occur In the event of a power failure the AutoFlush System valve will open and may discharge boiling water Sweat F...

Страница 14: ...n there is 208 240 Volt incoming power connected 24 Volt transformer secondary output and on board 5 Volt DC control power are present _________________________________________________________________...

Страница 15: ...s not related to component identification Models CT12E shown with cover removed NOTE FOR ILLUSTRATIVE PURPOSES ONLY Some components may be omitted or altered for clarity Do not use for wiring repair o...

Страница 16: ...pole All 3 Phase models 103453 Contactor 50A 4 pole CT12E 100471 2 Probe Assembly All models 99096MS Heating Element Gasket All models 103938 Acrylic Shield All Models 99314 Power Fuse 60A 250V CT12E...

Страница 17: ...sired steambathing temperatures Do not locate the control above or near the steam head or direct steam emissions Failure to install according to instruc tions will result in an inoperative control and...

Страница 18: ...steam head or direct steam emissions IMPORTANT See installation instructions for the MSTS Temperature Probe before rough in or installation of control pgs 19 20 Step 2 Make a one inch diameter hole i...

Страница 19: ...ICONE TO ANY OTHER PARTS OF THE CONTROL INCLUDING THE ADHESIVE GASKET Step 7 Insure the mounting surface is clean and dry as required for good adhesion Apply silicone into the hole in the wall as requ...

Страница 20: ...EP 3 Diagram 4 Remove and discard the peel off paper from the switch housing to expose the adhesive as shown in Diagram 4 STEP 4 Diagram 5 Apply silicone provided with eTEMPO PLUS control to the hole...

Страница 21: ...atures Do not locate the MSTS above or near the steam head or direct steam emissions The probe has an integral 60 cable Insure that the probe and or steam generator are located accordingly 2 Drill a 5...

Страница 22: ...xposed as shown below Insure a minimum of 1 4 of the temperature bulb is exposed to the air Failure to do so may result in an inopera tive control and a hazardous condition The exposed area of the tem...

Страница 23: ...the control is turned ON The duration required for the steam room to reach steambathing temperatures depends on the steam room construction and steam generator specifications Steam may continue to flo...

Страница 24: ...20 minutes and 110 F will be used the next time the control is turned on If the control times out not manually turned off then the previous user time and temperature settings will be used when the ste...

Страница 25: ...uge strength and suitability Limit to a maximum of a few drops for a steambathing session The bather should exit the steambath IMMEDIATELY if dizziness occurs If skin irritation occurs stop using the...

Страница 26: ...O Plus controls according to installation instructions Failure to install according to instructions will result in an inoperative control or hazardous overheating or inadequate heating of the steam ro...

Страница 27: ...LUB THERAPY eTEMPO eTEMPO PLUS FROM BATHROOM TO SPA MAKING WELLNESS A WAY OF LIFE MUSICTHERAPY STEAM HOME STEAM ON DEMAND STEAMTHERAPY and SUSSMAN are registered trademarks of Sussman Automatic Corpor...

Отзывы: