Mr. Heater HST45 Скачать руководство пользователя страница 10

10

Mr. Heater | Gas-Fired Low-Intensity Infrared Heater

Operating Instructions and Owner’s Manual

Hang the Heater

Residential garages come in a variety of sizes, shapes, styles and 
methods of construction. Because of all these variables, it is not 
possible to include mounting hardware with the Mr. Heater MHT 
heater. Although wooden rafters and joists are the most common 
overhead structural members in residential garage applications, other 
structural configurations are also illustrated below.

In the typical suspension methods shown below, lengths of chain 
are shown as a means of lowering the heater. However, for most 
residential applications it may not be necessary to lower the heater. 
Instead, it may be possible to screw hook-type hardware into the 
underside of a beam. The exposed hook could directly engage one 
of the two mounting holes in the front fixed hanger, while another 
hook could engage in one of the three suspension loops of the rear 

movable hanger.

Whichever method of suspension is selected, the two required 

suspension points must be capable of supporting a minimum 
of 150 pounds each.

Heater Orientation

The MHT tube heater may be installed in any of the three 
orientations indicated below. Select the heater orientation that is 
best suited for the location that you have chosen for your heater. 

   

 

 Horizontally  

 

 Tilted 45° Right  

 

 Tilted 45°° Left  

 NOTE:

 If the heater is going to be vented through the roof, 

be sure to carefully review the roof option installa-
tion portion of this section. Ensure that the selected 
mounting site will satisfy the measurement param-
eters (vent length not to exceed 25 feet) described in 

that section. Horizontal Installation

Horizontal Installation

1. Using S-hooks, attach two equal lengths of 2/0 chain, or 

equivalent, to the two uppermost holes in the front fixed hanger. 

2. Slip the free end of both chains onto another S-hook, as shown.  

3. The uppermost S-hook can now be installed on the suspension 

hardware that you have installed for suspension of the unit. An 
additional length of chain may also now be installed, if required, 
to lower the heater. 

 NOTE: 

  The hook portion of hook-type suspension hardware 

may directly engage the two holes in the front fixed 
hanger and the center loop of the rear moveable 

hanger.

 

 

45° Tilted Installation 

1. Determine if the heater is going to be tilted left, or tilted right. 

The front and rear suspension points selected must be on the 
same side (left or right) of the heater as shown below.  

2. Attach suspension hooks and/or chains to the selected suspension 

points of the heater. 

Wood Beam

Threaded Hook

Most common for 
residential 
applications

Locknut

Washer

Wood Beam

Washer

Screw Hook

 

min. 3/8" (10 mm)

I-Beam

Beam Clamp

As Req'd

S-Hook

Bar Joist Clip

Truss

Concrete Beam

Anchor

Most common for non-residential applications

Front Fixed Hanger

Rear Movable Hanger

Use these two suspension 
points for 

Tilted 45

°

 Right 

Installation

Tilted Right

 

Use these two suspension points for 

Tilted 

45

°

 Left

 Installation 

Tilted Left

Содержание HST45

Страница 1: ...any electrical switch do not use any phone in your building supplier If you cannot reach your gas supplier call the Fire Department Gas Fired Low Intensity Infrared Heaters approved for residential Ga...

Страница 2: ...Echec pour se conformer aux precautions et aux in structions a fourni avec cet appareil de chauffage avoir pour resultat la mort blessure et la perte de propriete ou les dommages physiques serieuses d...

Страница 3: ...the transfer of body oils from the hands to the surface of the reflector Vent Kit F102840 1 2 3 x 2 Pipe 26GA 2 1 36 x 3 B Vent 3 1 Gas Vent Top 3 4 1 Adj Wall Thimble 5 1 Storm Collar 6 1 3 Elbow 7...

Страница 4: ...t energy downward to the space to be heated Heat Exchanger A U shaped tube through which the heated products of combustion pass Rear Movable Hanger Provides support for the heat exchanger and reflecto...

Страница 5: ...ectrical Rating 120VAC 60Hz single phase 1 amp Connection 3 pin molded plug Gas Inlet Connection Connection Male NPT Gas Inlet Pressure The minimum inlet gas supply pressure for the purpose of input a...

Страница 6: ...nting requirements for the MHT tube heater Specifies the national standards and applicable codes that apply to the gas electric and venting requirements Specifies the national standards and applicable...

Страница 7: ...above the floor Minimum required safe distances to combustibles must be maintained from vehicles parked below the heater When installed over hoists the minimum required safe distances to combustible...

Страница 8: ...as required Choose Location for Heater When selecting a suitable mounting location for the MHT tube heater it is important to consider the following 1 The heater must meet the minimum mounting height...

Страница 9: ...ontal venting sections must slope away from the heater at a rate of per foot 5 The total length of vent pipe horizontal and vertical runs combined plus the length of the exterior termination must not...

Страница 10: ...nted through the roof be sure to carefully review the roof option installa tion portion of this section Ensure that the selected mounting site will satisfy the measurement param eters vent length not...

Страница 11: ...he gaskets The tube ends extend through the flanges to help with alignment 3 Using the four long and four short nuts from the bolt kit 02876 secure the tube set to the burner box As shown in the diagr...

Страница 12: ...current CSA B149 1 Natural Gas and Propane Installation Code 2 In accordance with the current ANSI Z223 1 NFPA 54 National Fuel Gas Code A vent shall not terminate directly above a sidewalk or paved d...

Страница 13: ...ustible wall refer to the latest edition of the National Fuel Gas Code or the authority having jurisdiction In regions of the country where prevailing winds are consistently higher than 40 mph it may...

Страница 14: ...is is to be constructed of galvanized sheet metal or other approved noncombustible corrosion resistant material as indicated by state and or local codes 2 For horizontal venting the vent lengths may b...

Страница 15: ...ength should be shortened or insulated g For vent specifications all of the following conditions must be met The maximum equivalent length of vent pipe should be carefully observed A safety switch in...

Страница 16: ...e area opening shall be provided below the heater for each 1 000 Btu hr of heater input When outside air is used the opening below the heater shall be one square inch of free area for each 4 000 Btu h...

Страница 17: ...hown below To check system pressure a plugged 1 8 NPT tapping is required upstream of the manual gas shut off valve supplied with the heater Before connecting the heater to the supply system verify th...

Страница 18: ...ns and burrs 3 Use LP resistant joint compound on all threads 4 Check the pipe and tube connections for leaks before placing heating equipment into service When checking for gas leaks use a soap and w...

Страница 19: ...will then occur 8 Periodic visual check of burner flame while unit is in operation through sight glass in bottom of unit Section 6 MAINTENANCE Pre Season Maintenance Heater area to be kept clear and f...

Страница 20: ...itch does not operate Igniter spark gap incorrect Try This Unplug heater power cord from the electrical outlet wait for a minimum of five seconds Plug heater cord back into outlet Unplug heater power...

Страница 21: ...nlet pressure requirements contact the gas company Check for 24V across valve terminals Check Shutoff On Valve IF NO Check wiring between the ignition module and the valve Repair replace wires as requ...

Страница 22: ...ters on the illustrations are keyed to the associated parts list I B A C J F H G D E ITEM PART NUMBER DESCRIPTION HST 35 HST 45 A 02808 Spark Electrode 1 1 B 02837 Ignition Wire 1 1 05795 Orifice MHT...

Страница 23: ...CHASE REF ITEM DESCRIPTION A F202850 MHT 45NG Burner Box for F208850 F202851 MHT 45LP Burner Box for F202851 B F106250 MHT45 Tube Set Long C 06014 Hanger D 06016 Hanger Clamp E 06008 9 MHT 45 Reflecto...

Страница 24: ...the claim Also supply us with the purchase date and the name and address of the dealer from whom you purchased our product The foregoing is the full extent of the responsibility of the Company There a...

Отзывы: