![MPE CHAIN-VEY Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/mpe/chain-vey/chain-vey_installation-and-operation-manual_1843041013.webp)
12
The chain connector link joins the two ends of the chain together to complete the loop.
The clean-out disc is a 1/8” [.32cm] thick FDA compliant polyurethane disc used for wiping the
inside walls of the conveyor piping. Because the OD of the clean-out disc is larger than the ID of
the piping, it is able to collect any product that is left behind by the conveyor discs.
*Installation of the connector link in accordance with the direction of travel is important for
reducing the wear on the cleanout disc.
*It is very important to avoid stripping the threads of the connector link. A stainless steel anti-
seize lubricant is recommended during install. The bolts should be fastened with the suggested
torque of 268.4 in-lb [30.3 N-m]
Ceiling / Floor Supports:
Ceiling and floor supports are used to support the conveyor pipe and keep them at the set distance
of 12.75” [32.39cm]. The floor support stand is design to utilize leveling mounts that allow for
vertical adjustment of horizontal piping. The ceiling support is designed to allow for suspension
from the ceiling using 3/8” [10mm] threaded rod or cable. The ceiling support may also be used on
vertical piping, to keep the piping at the set distance of 12.75” [32.39cm]. A ceiling support or
floor support should be used to support the piping approximately every 8ft [2.44m].
FLOOR SUPPORT
CEILING SUPPORT
Содержание CHAIN-VEY
Страница 1: ......