17
Chapter 3: Connect the machine, fill and prepare fort he
required application
-
Power connection
-
Start up
-
Connecting an externally closed application
-
Switching on the temperature control unit
-
Setting the over-temperature switch
-
Setting set point limits
-
Entering a set point
-
Starting temperature control
-
Ending temperature control
-
Filling and air purging an externally closed application
-
Draining an externally closed application
-
Thermofluid change / internal cleaning