Table of Contents
68P64115A21–B
1X SC 4812T-MC Multicarrier BTS Optimization/ATP
x
Sept 2003
Figure 1: DC Power Input Connector Comparison
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2: I/O Plate Comparison
Figure 3: PA Location Comparison
Figure 4: PA Breaker Mapping Comparison
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
List of Figures
Figure 1-1: Null Modem Cable Detail
Figure 1-2: BTS Starter Frame (–48 V configuration)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-3: BTS Starter Frame (+27 V configuration)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-4: BTS Expansion Frame (–48 V configuration)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-5: BTS Expansion Frame (+27 V configuration)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-6: BTS Multicarrier Frame Power Amplilfier Configuration – 3 Sector (+27V Shown)
Figure 1-7: BTS Multicarrier Frame Power Amplilfier Configuration – 6 Sector (+27V Shown)
Figure 1-8: Starter Frame I/O (Interconnect) Plate
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-9: Expansion Frame I/O (Interconnect) Plate
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1-11: Power Amplifier (PA) and BBX Configurations
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2-2: Backplane DIP Switch Settings
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 2-3: Breaker Panel – 27 V shown (–48 V is Similar)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3-1: LMF Folder Structure
Figure 3-2: Span I/O Board T1 Span Isolation
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3-3: LMF Connection Detail
Figure 3-4: BTS Login screen – identifying circuit and packet BTS files
. . . . . . . . . . . . . . . . . . . . . .
Figure 3-5: Self–Managed Network Elements (NEs) state of a packet mode SC4812T
Figure 3-6: Available packet mode commands
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3-7: Packet mode site with MCC–1 and BBX–1 under LMF control
. . . . . . . . . . . . . . . . . . . .
Figure 3-8: CDMA LMF Computer Common MMI Connections
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3-10: Null Modem Cable Detail
Figure 3-11: CSM MMI terminal connection
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3-12: Cable Calibration Test Setup
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3-13: Cable Calibration Test Setup (Advantest R3267, Agilent E4406A)
Figure 3-14: TX Calibration Test Setup (CyberTest, HP 8935, and Advantest)
. . . . . . . . . . . . . . . .
Figure 3-15: TX Calibration Test Setup (Advantest R3267 and Agilent E4406A)
Figure 3-16: TX Calibration Test Setup – Agilent E7495A (IS–95A/B and CDMA2000 1X)
Figure 3-17: IS–95A/B and CDMA2000 1X Optimization/ATP Test Setup –
Figure 3-18: IS–95 A/B Optimization/ATP Test Setup Calibration
Using Directional Coupler (CyberTest, HP 8935 and Advantest)
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3-19: Optimization/ATP Test Setup HP 8921A
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3-20: IS–95 A/B and CDMA 2000 Optimization/ATP Test Setup Using Directional Coupler