October 26, 2007
6880309U09-A
6-46
Disassembly/Reassembly Procedures
: Replacement Procedures
4. Attach the Interface Board onto the Main Unit PCB. Then, using a CR-V PH2 torque driver,
fasten the provided taptite screw M2.6X6 to the chassis as shown in
(Torqued to
3.5–4.6 kgf*cm/ 3–4 in. lbs).
Figure 6-87. Installing Interface Board to Chassis
5. Attach the thicker foam on top of the connector of option board as shown in
first removing the adhesive cover.
Figure 6-88. Paste Foam to Option Board
6. Attach the option board to the Interface Board as shown in
.
Figure 6-89. Attach Option Board to Interface Board
Interface Board
Foam
Option Board
OPTION BOARD
Содержание PM1200
Страница 1: ......
Страница 2: ......
Страница 6: ...iv Notes ...
Страница 30: ...October 26 2007 6880309U09 A 2 4 Basic Maintenance Handling Precautions Notes ...
Страница 38: ...October 26 2007 6880309U09 A Notes 3 8 Basic Theory of Operation PLL Synthesizer ...
Страница 42: ...October 26 2007 6880309U09 A Notes 4 4 Test Equipment Service Aids and Tools Field Programming Equipment ...
Страница 104: ...October 26 2007 6880309U09 A Notes 6 50 Disassembly Reassembly Procedures Fastener Torque Chart ...
Страница 108: ...October 26 2007 6880309U09 A Notes 7 4 Basic Troubleshooting Receiver Troubleshooting ...
Страница 122: ...9 4 Exploded Views and Parts Lists PM1200 Radio Exploded View October 26 2007 6880309U09 A Notes ...
Страница 126: ...October 26 2007 6816532H01 A B 2 Motorola Service Centers Motorola Federal Technical Center Notes ...
Страница 134: ...October 26 2007 6880309U09 A Glossary 8 Notes ...
Страница 137: ......