October 26, 2007
6880309U09-A
6-40
Disassembly/Reassembly Procedures
: Replacement Procedures
14. Place the top cover [24] on the chassis [11] and seat it properly. Compress the cover and
chassis together to squeeze the foam [25] into place and make torquing of the screws easier.
15. Using a CR-V PH2 torque driver, fasten the 7 binding head screws M3x6 SUS B [23] to the
top cover [24] follow the sequence as shown in
(Torqued to 5.8–6.9 kgf*cm/
5–6 in. lbs).
Figure 6-74. Sequence for Installing Top Cover Screws
6.2.3.5 Connector-Unit Board Kit Disassembly/Reassembly
NOTE:
Bracketed numbers are identical to item numbers shown in
.
6.2.3.5.1 Connector-Unit Board Kit Disassembly
1. Before disassembling the FR-Interface board kit, perform a complete PA-Unit Board Kit
disassembly by following the steps outlined in
6.2.3.4.1: “PA-Unit Board Kit Disassembly” on
.
2
5
1
6
7
3
4
Содержание PM1200
Страница 1: ......
Страница 2: ......
Страница 6: ...iv Notes ...
Страница 30: ...October 26 2007 6880309U09 A 2 4 Basic Maintenance Handling Precautions Notes ...
Страница 38: ...October 26 2007 6880309U09 A Notes 3 8 Basic Theory of Operation PLL Synthesizer ...
Страница 42: ...October 26 2007 6880309U09 A Notes 4 4 Test Equipment Service Aids and Tools Field Programming Equipment ...
Страница 104: ...October 26 2007 6880309U09 A Notes 6 50 Disassembly Reassembly Procedures Fastener Torque Chart ...
Страница 108: ...October 26 2007 6880309U09 A Notes 7 4 Basic Troubleshooting Receiver Troubleshooting ...
Страница 122: ...9 4 Exploded Views and Parts Lists PM1200 Radio Exploded View October 26 2007 6880309U09 A Notes ...
Страница 126: ...October 26 2007 6816532H01 A B 2 Motorola Service Centers Motorola Federal Technical Center Notes ...
Страница 134: ...October 26 2007 6880309U09 A Glossary 8 Notes ...
Страница 137: ......