Equipment Required
http://www.motorola.com/computer/literature
1-3
1
Equipment Required
The following equipment is required to complete an MVME2603/2604
system:
❏
VME system enclosure
❏
System console terminal
❏
Operating system (and/or application software)
❏
Disk drives (and/or other I/O) and controllers
❏
Transition module (MVME712M or MVME761) and connecting
cables
MVME2603/2604 VME modules are factory-configured for I/O handling
via either MVME712M or MVME761 transition modules.
Overview of Startup Procedure
The following table lists the things you will need to do before you can use
this board and tells where to find the information you need to perform each
step. Be sure to read this entire chapter, including all Caution and Warning
notes, before you begin.
Table 1-1. Startup Overview
What you need to do...
Refer to...
Unpack the hardware.
Unpacking Instructions
on page 1-5
Configure the hardware by setting
jumpers on the boards and transition
modules.
MVME2603/2604 Base Board Preparation
on page 1-6
and
MVME712M Transition Module Preparation
on
page 1-14
or
MVME761 Transition Module Preparation
on page 1-25
Ensure memory mezzanines are
properly installed on the base board.
RAM200 Memory Mezzanine Installation
on page 1-35
Install the MVME2603/2604 VME
module in the chassis.
MVME2603/2604 VME Module Installation
on page
1-42