14.7 Surge Arrestor Wiring
An Andrew Grounding Kit and Surge Arrestor Unit must be located at the ODU and reliably
grounded as shown in Figure 95. There may also be a regulatory requirement to crossbond
the screened CAT-5 at regular intervals up the mast. Refer to local regulatory requirements
for further details.
A second Surge Arrestor Unit should be mounted at the building entry point and must be
grounded.
The termination of the CAT-5 Cable into the Surge Arrestor Unit is illustrated in Table 23,
Table 24 and Figure 119. The screen from the cable must be terminated into the ground
terminal within the unit to ensure the continuity of the screen. Earth Sleeving should be used
to cover the shield ground connection to prevent internal shorting within the unit.
Terminal Identification
Conductor
RJ45 Pin
CON3 Pin 1
Orange/White
1
CON3 Pin 2
Orange
2
CON3 Pin 3
Green/White
3
CON3 Pin 6
Green
6
CON1 Pin 4
Blue
4
CON1 Pin 5
Blue/White
5
CON1 Pin 7
Brown/White
7
CON1 Pin 8
Brown
8
Table 23 - Surge Arrestor ALPU-ORT Cable 1 Termination
Terminal Identification
Conductor
RJ45 Pin
CON4 Pin 1
Orange/White
1
CON4 Pin 2
Orange
2
CON4 Pin 3
Green/White
3
CON4 Pin 6
Green
6
CON2 Pin 4
Blue
4
CON2 Pin 5
Blue/White
5
CON2 Pin 7
Brown/White
7
CON2 Pin 8
Brown
8
Table 24 - Surge Arrestor ALPU-ORT Cable 2 Termination
Содержание MotoWI4 PTP 600 Series
Страница 1: ...PTP 600 Series User Guide MOTOROLA POINT TO POINT WIRELESS SOLUTIONS ...
Страница 2: ......
Страница 20: ...18 ...
Страница 87: ...85 Figure 34 VLAN Configuration Fields ...
Страница 90: ...88 Figure 37 Save Configuration File Screen ...
Страница 99: ...97 8 3 3 Detailed Counters Page Figure 43 Detailed Counters Page ...
Страница 110: ...108 Figure 49 Fixed Frequency Operation ...
Страница 113: ...111 8 3 4 5 Disarm Step 5 of the installation wizard is the disarm phase Figure 52 Disarm Installation ...
Страница 165: ...163 Figure 97 Lower Grounding Configuration ...
Страница 167: ...165 Figure 98 Surge Arrestor ALPU ORT Connection Illustration Note Cable screens have been sleeved ...
Страница 180: ...178 Figure 105 Connectorized 600 Series bridge Disarm Installation Page ...
Страница 199: ...197 Figure 116 Diagrammatically Showing the E1 T1 Connections ...
Страница 201: ...199 Figure 117 Typical Mast Installation with the addition of the E1 T1 cable ...
Страница 204: ...202 Figure 119 Surge Arrestor ALPU ORT Connection Illustration ...
Страница 208: ...206 Figure 123 QPSK 0 87 Single Paylaod Figure 124 16 QAM 0 63 Single Payload Figure 125 16 QAM 0 87 Single Paylaod ...
Страница 209: ...207 Figure 126 64 QAM 0 75 Single Payload Figure 127 64 QAM 0 92 Single Payload Figure 128 256 QAM 0 81 Single Payload ...
Страница 210: ...208 Figure 129 16 QAM 0 63 Dual Payload Figure 130 16 QAM 0 87 Dual Payload Figure 131 64 QAM 0 75 Dual Payload ...
Страница 211: ...209 Figure 132 64 QAM 0 92 Dual Payload Figure 133 256 QAM 0 81 Dual Payload ...