118
8.3.7.1 Wireless
Channels
The PTP 600 Series Bridge operates using a set of predefined overlapping channels. There
are a different number of channels, depending on the raster mode selected. Each channel
occupies 30 MHz of wireless spectrum and is offset in center frequency from its neighboring
channel by 10 MHz. It is important to note that adjacent channels on the Spectrum
management display have a 10 MHz overlap to the adjacent channel.
The default channelization can be modified by varying the lower center frequency attribute in
the installation wizard - see section 8.3.4.4. See Section 5.4 and 5.4.3 for more detail.
8.3.7.2
Spectrum Management Measurements
The 600 Series bridge performs two mean signal measurements per TDD cycle, per channel.
This mean measurement represents the mean received signal power for the 40
μ
S
measurement period.
The Spectrum Management algorithm collects measurements equally from all channels. This
process is called the Channel Availability Check (hereafter referred to by the acronym CAC).
The CAC uses a round-robin channel selection process to collect an equal amount of
measurements from each channel. It is important to note that the CAC measurement process
is not altered by the channel barring process. Measurements are still collected for all
channels irrespective of the number of barred channels.
8.3.7.3 Measurement
Analysis
Spectrum Management uses statistical analysis to process the received peak and mean
measurement. The statistical analysis is based on a fixed, one minute, measurement
quantization period. Spectrum Management collects data for the specified quantization period
and only at the end of the period is the statistical analysis performed.
The analysis produces three key metrics for each channel:
•
Peak of Means
•
99.9% Percentile of the Means
•
Mean of Means
Содержание MotoWI4 PTP 600 Series
Страница 1: ...PTP 600 Series User Guide MOTOROLA POINT TO POINT WIRELESS SOLUTIONS ...
Страница 2: ......
Страница 20: ...18 ...
Страница 87: ...85 Figure 34 VLAN Configuration Fields ...
Страница 90: ...88 Figure 37 Save Configuration File Screen ...
Страница 99: ...97 8 3 3 Detailed Counters Page Figure 43 Detailed Counters Page ...
Страница 110: ...108 Figure 49 Fixed Frequency Operation ...
Страница 113: ...111 8 3 4 5 Disarm Step 5 of the installation wizard is the disarm phase Figure 52 Disarm Installation ...
Страница 165: ...163 Figure 97 Lower Grounding Configuration ...
Страница 167: ...165 Figure 98 Surge Arrestor ALPU ORT Connection Illustration Note Cable screens have been sleeved ...
Страница 180: ...178 Figure 105 Connectorized 600 Series bridge Disarm Installation Page ...
Страница 199: ...197 Figure 116 Diagrammatically Showing the E1 T1 Connections ...
Страница 201: ...199 Figure 117 Typical Mast Installation with the addition of the E1 T1 cable ...
Страница 204: ...202 Figure 119 Surge Arrestor ALPU ORT Connection Illustration ...
Страница 208: ...206 Figure 123 QPSK 0 87 Single Paylaod Figure 124 16 QAM 0 63 Single Payload Figure 125 16 QAM 0 87 Single Paylaod ...
Страница 209: ...207 Figure 126 64 QAM 0 75 Single Payload Figure 127 64 QAM 0 92 Single Payload Figure 128 256 QAM 0 81 Single Payload ...
Страница 210: ...208 Figure 129 16 QAM 0 63 Dual Payload Figure 130 16 QAM 0 87 Dual Payload Figure 131 64 QAM 0 75 Dual Payload ...
Страница 211: ...209 Figure 132 64 QAM 0 92 Dual Payload Figure 133 256 QAM 0 81 Dual Payload ...