
Grounding and lightning protection
Chapter 2 Planning considerations
phn-2182_002v000
2-18
May 2011
Protection inside a high rise building
The following protection requirements must be observed inside multi-story or high rise
buildings (
Figure 2-6
):
x
The drop cable shield must be bonded
to the
building grounding system at the
entry point to the building.
x
The drop cable shield must be bonded
to the
building grounding system at the
entry point to the equipment area.
x
An LPU must be installed within 600 mm (24 in) of the entry point to the
equipment area.
Figure 2-6
Grounding and lightning protection inside high building
Содержание Motorola PTP 250
Страница 20: ...List of Tables phn 2182_002v000 xiv May 2011 ...
Страница 30: ......
Страница 80: ...Data network planning Chapter 2 Planning considerations phn 2182_002v000 2 22 May 2011 ...
Страница 126: ...Notifications Chapter 4 Reference information phn 2182_002v000 4 36 May 2011 ...
Страница 192: ...Connecting link to the network Chapter 6 Configuration and alignment phn 2182_002v000 6 36 May 2011 ...
Страница 234: ...Testing the radio link Chapter 8 Troubleshooting phn 2182_002v000 8 14 May 2011 ...