
Chapter 6
phn-2182_002v000
May 2011
6-1
Chapter 6 Configuration and alignment
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
.
.
.
This chapter describes all configuration and alignment tasks that are performed when
a PTP 250 link is deployed.
Before proceeding with unit configuration and antenna alignment, observe the
precautions described in
Preparing for configuration and alignment
on page
6-2
.
Configure the two units, one as ‘Master’ and the other as ‘Slave’ by performing the
following tasks:
x
Connecting to the unit
on page
6-3
describes how to connect a PC to the unit,
power it up and open the web interface.
x
Upgrading firmware version
on page
6-10
describes how to ensure that the latest
firmware version is installed on the unit.
x
Using the installation wizard
on page
6-14
describes how to configure the LAN,
wireless, date and email attributes of the unit.
When all equipment has been installed at both link ends, perform the following tasks:
x
Aligning antennas
on page
6-24
describes how to align integrated and
connectorized antennas.
x
Connecting link to the network
on page
6-31
describes how to review link
performance and connect to the network.
Содержание Motorola PTP 250
Страница 20: ...List of Tables phn 2182_002v000 xiv May 2011 ...
Страница 30: ......
Страница 80: ...Data network planning Chapter 2 Planning considerations phn 2182_002v000 2 22 May 2011 ...
Страница 126: ...Notifications Chapter 4 Reference information phn 2182_002v000 4 36 May 2011 ...
Страница 192: ...Connecting link to the network Chapter 6 Configuration and alignment phn 2182_002v000 6 36 May 2011 ...
Страница 234: ...Testing the radio link Chapter 8 Troubleshooting phn 2182_002v000 8 14 May 2011 ...