HARDWARE PREPARATION AND INSTALLATION
M68HC11EVBU/D
2-9
2.3.5
Trace Enable Header (J7)
Use jumper header J7 to select BUFFALO monitor debug operations by connecting the
PA3/OC5 signal (pin 2) to the XIRQ* signal (pin 1). The EVBU is factory-configured and
shipped with a fabricated jumper installed on pins 1 and 2 as shown below. This jumper must be
installed during debugging operations.
J7
1
2
PA3/OC5
XIRQ*
Fabricated Jumper
For special applications which use the PA3/OC5 signal, remove the fabricated jumper on pins 1
and 2 to avoid interference between the PA3/OC5 signal and the XIRQ* signal. In this
configuration, several BUFFALO monitor commands are not available. BUFFALO commands
which will not function without a jumper installed on J7 are: proceed (P), stop at address
(STOPAT), and trace (T) commands.
Refer to the schematic diagram (Figure 6-2) located in Chapter 6 for PA3/OC5 signal wiring
information.
Содержание M68HC11EVBD
Страница 4: ......
Страница 92: ...HARDWARE DESCRIPTION 5 4 M68HC11EVBU D ...
Страница 101: ...SUPPORT INFORMATION M68HC11EVBU D 6 9 Figure 6 2 EVBU Schematic Diagram Sheet 1 of 3 ...
Страница 102: ...SUPPORT INFORMATION 6 10 M68HC11EVBU D ...
Страница 103: ...SUPPORT INFORMATION M68HC11EVBU D 6 11 Figure 6 2 EVBU Schematic Diagram Sheet 2 of 3 ...
Страница 104: ...SUPPORT INFORMATION 6 12 M68HC11EVBU D ...
Страница 105: ...SUPPORT INFORMATION M68HC11EVBU D 6 13 Figure 6 2 EVBU Schematic Diagram Sheet 3 of 3 ...
Страница 106: ...SUPPORT INFORMATION 6 14 M68HC11EVBU D ...