HARDWARE PREPARATION AND INSTALLATION
M68HC11EVBU/D
2-1
CHAPTER 2
HARDWARE PREPARATION AND INSTALLATION
2.1
INTRODUCTION
This chapter provides unpacking instructions, hardware preparation, and installation instructions
for the EVBU.
2.2
UNPACKING INSTRUCTIONS
NOTE
If upon receipt the shipping carton is damaged, request carrier’s
agent is present during unpacking and inspection of the EVBU.
Unpack EVBU from shipping carton. Refer to packing list and verify that all items are present.
Save packing material for storing or reshipping the EVBU.
2.3
HARDWARE PREPARATION
This paragraph describes the inspection/preparation of EVBU components prior to use. This
description ensures the EVBU components are properly configured before start up.
The EVBU should be inspected and prepared for proper jumper placements. Figure 2-1 illustrates
the EVBU connector, switch, and jumper header locations. Diode jumpers (DJX) and test point
(TPX) locations are also illustrated.
An ex5 Vdc power supply connects to P1 on the EVBU. External terminal/host computer
equipment connects to P2 on the EVBU. An external battery may be connected to P3 on the
EVBU for battery backup purposes. Connectors P4 and P5 are used to connect the EVBU to the
wire-wrap area or other user-supplied equipment.
Switch S1 lets you reset the EVBU.
Содержание M68HC11EVBD
Страница 4: ......
Страница 92: ...HARDWARE DESCRIPTION 5 4 M68HC11EVBU D ...
Страница 101: ...SUPPORT INFORMATION M68HC11EVBU D 6 9 Figure 6 2 EVBU Schematic Diagram Sheet 1 of 3 ...
Страница 102: ...SUPPORT INFORMATION 6 10 M68HC11EVBU D ...
Страница 103: ...SUPPORT INFORMATION M68HC11EVBU D 6 11 Figure 6 2 EVBU Schematic Diagram Sheet 2 of 3 ...
Страница 104: ...SUPPORT INFORMATION 6 12 M68HC11EVBU D ...
Страница 105: ...SUPPORT INFORMATION M68HC11EVBU D 6 13 Figure 6 2 EVBU Schematic Diagram Sheet 3 of 3 ...
Страница 106: ...SUPPORT INFORMATION 6 14 M68HC11EVBU D ...