39
MN003563A01-B
Operation and Configuration
3.
Click
Ports
.
Result:
The
Ports
screen is displayed.
Figure 2-17
Ports Test Screen
4.
Click on each of the following port tests to start:
•
Test USB ports:
This test briefly checks the external USB ports of the LXN 500.
1. To perform this test, on the front panel
of the LXN 500
, remove the four screws that hold the
protective covers of the USB ports (See
2. Plug-in a mass storage flash drive(s) to the USB port.
3. Click
Test USB ports
.
Result:
The LXN 500 exchanges data for 10 seconds with the storage device and indicts
SUCCESS or FAIL.
•
Test Serial1:
This test checks the internal RS232 communication ports that interconnect boards inside the
LXN 500.
•
Test SSD:
This test checks the hard drives of the LXN 500. Click
Test SSD
and wait
for
SUCCESS or FAIL
indication.
•
Test USB (long test):
This test extensively checks the USB ports of the LXN 500.
1. To perform this test, on the front panel, remove the four screws that hold the protective
panels of the USB ports.
2. Plug-in a FAT32 only flash drive(s) to the USB port.
3. Click
Test USB ports
.
Result:
The LXN 500 exchanges data for one hour with the storage device and indicts
SUCCESS or FAIL.
4. Reinstall the four screws that hold the protective panels of the USB ports.
IMPORTANT
This test may last up to one hour and once started cannot be stopped.
Содержание LXN 500
Страница 10: ...MN003563A01 B About LXN 500 10 Send Feedback ...
Страница 16: ...MN003563A01 B Overview 16 Send Feedback ...
Страница 46: ...MN003563A01 B Operation and Configuration 46 Send Feedback ...
Страница 58: ...MN003563A01 B Vehicle Installation 58 Send Feedback ...
Страница 64: ...MN003563A01 B Troubleshooting and Maintenance 64 Send Feedback ...