10
AP5181 Access Point
The image displayed has the heavy weather accessory kit installed. Whether the unit uses the heavy
weather kit or not, remember to connect the AP-5181 to an appropriate earth ground using the
earth-ground boss on the back of the unit.
8.
Install 4 short binder head screws in the 4 slots (2 each on left and right sides of the tilt bracket). Set the
angle of the AP-5181 up or down as required for the installation. The 4 short binder head screws, and the
long screw hex nut can be tightened to lock the AP-5181into position.
Содержание AP-5181 - Wireless Access Point
Страница 1: ...AP 5181 Access Point DEPLOYMENT GUIDE ...
Страница 36: ...36 AP5181 Access Point ...
Страница 37: ...Deployment Guide 37 ...
Страница 38: ...38 AP5181 Access Point ...
Страница 39: ...Deployment Guide 39 ...