11
2. Safety
2.5 Handling precautions
2.5.1
Lifting by chains or ropes
•
Make sure that the handling area is clear of obstacles
and people.
•
Lift the generating set using only the lifting points provid-
ed and indicated by the decals.
•
The operator carrying out the lifting work must be quali-
fied to work with the crane.
•
Always use lifting equipment adequately sized and con-
trolled by authorized bodies.
•
Keep the generating set in a horizontal position.
•
Do not subject the generating set and the lifting equip-
ment used to undulating or abrupt movements that
transmit dynamic stresses to the structure.
•
It is forbidden to fix on the frame of the generating set
objects or accessories that modify the weight and centre
of gravity of the machine and subject the lifting points to
unexpected stresses.
•
Do not lift the generating set at a height higher than that
necessary for handling.
•
Do not leave the generating set suspended for longer
than necessary for handling.
D5260100
2.5.2
Lifting by forklift
•
Insert the frame using the pockets indicated by the rela-
tive decals.
•
Fork the generating set sideways to allow the forks to
protrude from the opposite side.
D5260110
Содержание RENTAL GE 50 KR-5
Страница 2: ......
Страница 10: ...2 Safety 6 2 2 Positioning of safety decal and information 1 2 2 3 4 5 5 5 5 6 6 7 7 8 9 10 11 6 D5260040...
Страница 58: ...7 Maintenance 54 NOTES...
Страница 66: ...8 Alarms 62 NOTES...
Страница 67: ......