Maintenance
6-22
August 2014
C2 Contour Air Drill
Wheel Bearings
Implement Hub
• Position implement in field position.
• Shut tractor off, remove key, and engage park brake.
• Block wheel on tractor.
• Raise the implement wheel enough to clear the
surface.
• Securely block implement frame.
• Remove wheel from hub.
• Remove the dust cap, cotter pin, and the slotted nut
and washer.
• Be careful when pulling the hub off as not to drop
the outer bearing.
• Clean spindle and bearing components with solvent.
• Inspect for wear on bearings, spindle and cups,
replace parts as required.
• Do not reuse old seals. Use only new seals when
assembling.
• Pack inner hub with bearing grease.
• Be sure bearing and cup are dry and clean.
• Work grease into the bearing rollers, until each part
of the bearing is completely full of grease.
• Install inner bearing and cup first, then press new
seals in place.
• Place hub on spindle.
• Install outer bearing, washer and slotted nut.
• Tighten nut while turning the wheel until a slight drag
is felt.
• Back nut off one slot and install a cotter pin. Bend
cotter pin up around nut.
• Pack grease inside the dust cap and tap into position.
Important
Check wheel bearings for play every
5,000 acres (2,000 hectares)
or yearly, which ever occurs first.
Tighten as required.
Содержание C2 Contour
Страница 1: ...OPERATOR S MANUAL S50150 02 C2 Contour Air Drill...
Страница 2: ......
Страница 14: ...Safety 1 10 August 2014 C2 Contour Air Drill Safety Signs Continued Decal Locations 25 and 31 Models...
Страница 15: ...Safety C2 Contour Air Drill August 2014 1 11 Safety Signs Continued Decal Locations 41 and 51 Models...
Страница 16: ...Safety 1 12 August 2014 C2 Contour Air Drill Safety Signs Continued Decal Locations 61 and 71 Models...
Страница 17: ...Safety C2 Contour Air Drill August 2014 1 13 Safety Signs Continued Decal Locations 80 86 and 90 Models...
Страница 19: ...Safety C2 Contour Air Drill August 2014 1 15 Lighting and Marking Continued...
Страница 20: ...Safety 1 16 August 2014 C2 Contour Air Drill Lighting and Marking Continued...
Страница 28: ...Checklist 3 4 August 2014 C2 Contour Air Drill Notes...
Страница 56: ...Operation 5 26 August 2014 C2 Contour Air Drill Notes...
Страница 82: ...Maintenance 6 26 August 2014 C2 Contour Air Drill Notes...
Страница 86: ...Storage 7 4 August 2014 C2 Contour Air Drill Notes...
Страница 91: ......