Introduction
4-2
August 2014
C2 Contour Air Drill
Introduction
This Operator’s Manual has been carefully prepared
to provide the necessary information regarding the
operation and adjustments, so that you may obtain
maximum service and satisfaction from your new
MORRIS CONTOUR DRILL floating hitch cultivator.
To protect your investment, study your manual before
starting or operating in the field. Learn how to operate
and service your CONTOUR DRILL floating hitch
cultivator correctly, failure to do so could result in
personal injury or equipment damage.
If you should find that you require information not
covered in this manual, contact your local MORRIS
Dealer. The Dealer will be glad to answer any questions
that may arise regarding the operation of your MORRIS
CONTOUR DRILL floating hitch cultivator.
MORRIS Dealers are kept informed on the best methods
of servicing and are equipped to provide prompt efficient
service if needed.
Occasionally, your CONTOUR DRILL floating hitch
cultivator may require replacement parts. Your
Dealer will be able to supply you with the necessary
replacement parts required. If the Dealer does not have
the necessary part, the MORRIS Factory will supply the
Dealer with it promptly.
Your MORRIS CONTOUR DRILL floating hitch cultivator
is designed to give satisfaction even under difficult
conditions. A small amount of time and effort spent in
protecting it against rust, wear and replacing worn parts
will increase the life and trade-in value.
Keep this book handy for ready reference at all times.
It is the policy of Morris Industries Ltd. to improve its
products whenever it is possible to do so. The Company reserves the right to make changes or add improvements
at any time without incurring any obligation to make such changes on machines sold previously.
Содержание C2 Contour
Страница 1: ...OPERATOR S MANUAL S50150 02 C2 Contour Air Drill...
Страница 2: ......
Страница 14: ...Safety 1 10 August 2014 C2 Contour Air Drill Safety Signs Continued Decal Locations 25 and 31 Models...
Страница 15: ...Safety C2 Contour Air Drill August 2014 1 11 Safety Signs Continued Decal Locations 41 and 51 Models...
Страница 16: ...Safety 1 12 August 2014 C2 Contour Air Drill Safety Signs Continued Decal Locations 61 and 71 Models...
Страница 17: ...Safety C2 Contour Air Drill August 2014 1 13 Safety Signs Continued Decal Locations 80 86 and 90 Models...
Страница 19: ...Safety C2 Contour Air Drill August 2014 1 15 Lighting and Marking Continued...
Страница 20: ...Safety 1 16 August 2014 C2 Contour Air Drill Lighting and Marking Continued...
Страница 28: ...Checklist 3 4 August 2014 C2 Contour Air Drill Notes...
Страница 56: ...Operation 5 26 August 2014 C2 Contour Air Drill Notes...
Страница 82: ...Maintenance 6 26 August 2014 C2 Contour Air Drill Notes...
Страница 86: ...Storage 7 4 August 2014 C2 Contour Air Drill Notes...
Страница 91: ......