Maintenance
C2 Contour Air Drill
August 2014
6-19
Opener Maintenance - Continued
Bleeding Hydraulic System
If hydraulic system has been serviced air will need to
be bleed out of system as follows:
To bleed hydraulic system of air:
• Lift openers up and lock tractor remote in lift
position.
• With tractor hydraulics operating, open bleed-off
ball valves on end of drill wings.
• Allow oil to cycle for a few minutes then change
direction of tractor remote to lower openers and
cycle for a few more minutes.
• Close bleed-off ball valves and lift openers up.
• Repeat above procedure for a second time.
• Close bleed-off ball valves and lift openers up.
• Lock “Openers” valve and check to see that
openers stay firmly in position.
• If openers are spongy repeat procedure until air is
gone.
HIGH-PRESSURE FLUID HAZARD
To prevent serious injury or death:
• Relieve pressure on hydraulic system before
servicing or disconnecting hoses.
• Wear proper hand and eye protection when
searching for leaks. Use wood or cardboard
instead of hands.
• Keep all components in good repair.
Warning
Important
Turn “Operating” valve out to “Bleed Off/
Service” position and remove all pressure
from hydraulic systems before attempting any
service work on hydraulic components.
Hydraulic system must be bled after it has
been serviced (if any portion of the system
has been opened to atmosphere)
BLEED-OFF VALVE
Содержание C2 Contour
Страница 1: ...OPERATOR S MANUAL S50150 02 C2 Contour Air Drill...
Страница 2: ......
Страница 14: ...Safety 1 10 August 2014 C2 Contour Air Drill Safety Signs Continued Decal Locations 25 and 31 Models...
Страница 15: ...Safety C2 Contour Air Drill August 2014 1 11 Safety Signs Continued Decal Locations 41 and 51 Models...
Страница 16: ...Safety 1 12 August 2014 C2 Contour Air Drill Safety Signs Continued Decal Locations 61 and 71 Models...
Страница 17: ...Safety C2 Contour Air Drill August 2014 1 13 Safety Signs Continued Decal Locations 80 86 and 90 Models...
Страница 19: ...Safety C2 Contour Air Drill August 2014 1 15 Lighting and Marking Continued...
Страница 20: ...Safety 1 16 August 2014 C2 Contour Air Drill Lighting and Marking Continued...
Страница 28: ...Checklist 3 4 August 2014 C2 Contour Air Drill Notes...
Страница 56: ...Operation 5 26 August 2014 C2 Contour Air Drill Notes...
Страница 82: ...Maintenance 6 26 August 2014 C2 Contour Air Drill Notes...
Страница 86: ...Storage 7 4 August 2014 C2 Contour Air Drill Notes...
Страница 91: ......