![MorrHeat MHB280 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/morrheat/mhb280/mhb280_installation-operation-and-service-instructions_1835985016.webp)
16
MorrHeat - Most Heat In The Industry - Rev 3/18/2019
ATTENTION -
Disconnect
source before installing burner or servicing, can cause severe injury
or
death
.
All wiring should be done in accordance with rules of the National Electrical Code ANSI/NFPA - 70 latest
edition and any State or Local codes having jurisdiction.
1.
Before Any Wiring Is Done
-
Check burner voltage/cycle/phase. It must be compatible with the electricity
furnished at job site.
2. Wiring diagram is found in burner instruction manual. Follow diagram for proper wiring of burner and
controls.
3. Where burner motor voltage differs form control voltage, supply proper voltage to each.
4. Use properly sized fused disconnect and conductors for burner motor and control circuit.
Boiler Assembly & Wiring
NOTICE:
When the burner is field installed the installer must fil in the space between the burner
blast tube and the insulation black o the inside of the burner door with refractory mix
provided.
Burner Mounting